My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-10-2020 Council Packet
Orono
>
City Council
>
2020
>
02-10-2020 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2020 3:33:38 PM
Creation date
6/8/2020 2:57:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
AGENDA ITEM <br />Q)V, Item No.: 6 Date: February 10, 2020 <br />Item Description: Ferndale Road North — Pre Award Approval <br />Gti Presenter: Adam T. Edwards Agenda Consent Agenda <br />Esxo4� Public Works Director/City Engineer Section: <br />1. Purpose. The purpose of this action item is to gain Council approval prior to award per Joint Powers <br />Agreement (JPA) with the City of Plymouth for a road maintenance project on Ferndale Road N. <br />2. Background. Ferndale Road N is a shared roadway. Plymouth owns the east side from the centerline <br />from County Road 6 down to their southern boundary and Orono owns the west side to the southern <br />boundary of Plymouth and then the entire pavement south to the bridge over Hwy 12. North Ferndale <br />Road is an MSA road for both Orono and Plymouth. Plymouth has taken the lead on development of a <br />mill and overlay project for the pavement. Plymouth has contracted with SRF consulting to conduct the <br />feasibility study as well as the design and engineering for the project. Plymouth offered to lead the <br />project and provide the initial financing for the project with the City of Orono repaying Plymouth for our <br />portion over the next three years. In May of 2019 the Cities entered in a JPA for the project. The project <br />was bid in fall of 2019 however bids came back very high. This winter the City of Wayzata also joined <br />the project so that the entirety of Ferndale Road N from Wayzata Blvd. to County road 6 will be included. <br />Plymouth rebid the project in January. <br />3. Project Scope. The project consists of milling and overlaying the asphalt pavements. Spot repairs of <br />curbing and stormwater and all associated engineering and construction management. <br />4. Cost. Plymouth received six bids.The low <br />bid was from Valley Paving for $4,104,503.05. <br />The portion Orono is responsible for is <br />$349,002.0 <br />5. Funding. Projects will be funded with a <br />combination of the MSA Maintenance Fund and <br />Stormwater Fund. Estimated annual allotment <br />the MSA Maintenance Account is $100,000. Per <br />the JPA Plymouth will bill Orono in three annual <br />instalments of $116,334. <br />Estimated Orono Cost <br />Pavement <br />I Stormwater <br />Total <br />$ 296,373.40 <br />1 $ 52,628.60 <br />$ 349,002.00 <br />Fund <br />Cost Estimate <br />MSA Maintenance Fund <br />$ 296,373.40 <br />Stormwater Fund <br />$ 52,628.60 <br />Total <br />$ 349,002.00 <br />6. JPA Summary. The JPA is attached. Key points include: The City of Plymouth will provide overall <br />management of the project; each city will be responsible for payment for work done within their <br />boundaries; design and engineering fees will be split equally; both cities must accept the construction bid <br />prior to award; and Orono will repay Plymouth in three annual installments. <br />7. Staff Recommendation. Staff recommend award of the project to Valley Paving. <br />COUNCIL ACTION REQUESTED: <br />Move to approve that the City of Plymouth award the street maintenance project on Ferndale Road N to <br />Valley Paving per the Project JPA. <br />Exhibits <br />A. Bid Tab <br />B. JPA <br />Prepared By: 7E Reviewed By: 4J Approved By: -TV <br />
The URL can be used to link to this page
Your browser does not support the video tag.