Laserfiche WebLink
Christine Mattson <br /> From: Adam Edwards <br /> Sent: Monday, March 14, 2016 6:03 PM <br /> To: Christine Mattson <br /> Subject: RE: 1220 Bracketts Point Road/#2016-00133 <br /> Chris, <br /> i stamped the grading plan approved. <br /> A separate utility connection permit will be required for the sanitary reconnection. <br /> Perimeter erosion control measures should be installed by the Contractor and inspected by the City prior to <br /> any work, including demolition. Contractor must provide minimum 24 hour notice prior to inspection. <br /> Adam <br /> From: Christine Mattson <br /> Sent: Monday, March 14, 2016 4:14 PM <br /> To:Adam Edwards<aedwards@ci.orono.mn.us> <br /> Subject: FW: 1220 Bracketts Point Road/#2016-00133 <br /> We received an updated survey and plans for 1220 Bracketts Pont Road. Please review and provide comments. <br /> Thank you! <br /> From:Adam Edwards <br /> Sent: Friday, February 12, 2016 3:31 PM <br /> To: Christine Mattson<CMattson@ci.orono.mn.us> <br /> Cc: Melanie Curtis<MCurtis@ci.orono.mn.us> <br /> Subject: RE: 1220 Bracketts Point Road/#2016-00133 <br /> Chris, <br /> I've reviewed the subject site/grading plan and offer the following comments: <br /> 1. The plan does not depict the sanitary service line locations. A utilities permit will be required <br /> for disconnection and reconnection. <br /> 2. The plan shows the AC units are further than 5ft from the structure they service. This violates <br /> Sec. 78-1405. <br /> 3. The plan shows grading within the 75ft Lakeshore setback. Cut and fill calculations should be <br /> provided. If the amount exceeds 50 cubic Yards a CUP will be required. <br /> 4. The plan depic#s a �2 ft metal wall structure in the 75 ft Lakeshore setback. Allowed? <br /> Adam <br /> i <br />