My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Temp COO - 2016
Orono
>
Property Files
>
Street Address
>
B
>
Bracketts Point Road
>
1220 Bracketts Point Road - PID: 11-117-23-32-0018
>
Misc
>
Temp COO - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:29:46 PM
Creation date
5/29/2020 12:42:06 PM
Metadata
Fields
Template:
x Address Old
House Number
1220
Street Name
Bracketts Point
Street Type
Road
Address
1220 Bracketts Point Road
Document Type
Misc
PIN
1111723320018
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
160
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Roger Peitso <br /> From: Roger Peitso <br /> Sent: Wednesday, March 23, 2016 5:20 PM <br /> To: 'pete@Welchforsman.com' <br /> Cc: Jeremy Barnhart; Christine Mattson <br /> Subject: 1220 Brackets Point Road <br /> Pete, <br /> Here are the details I talked to you about on the phone about today. <br /> 1. Provide details for the radon system and location of the sump basket(s) <br /> 2. FYI if any of the ductwork for heating the house is outside of the building envelope duct testing is <br /> required. <br /> 3. Provide specifications for the connectors for the cast stone pieces. <br /> 4. What codes is this building being constructed under, the structural plans reference the IBC. <br /> 5. Special inspections are being called out so; <br /> a. Who is doing the inspections? <br /> b. What is the inspection schedule? <br /> c. I will need copies of the inspection reports, field notes and final assessments. <br /> 6. All details show the weather barrier being terminated behind the flashing, the water resistive barrier is <br /> required to terminate on top of the flashing per the 2015 Minnesota Residential Code Sec. R703.7 <br /> 7. Will the 1" space between the brick and the sheathing be grouted full or not? <br /> 8. Will the ledger plate attached to the I-beams for the L5 X 5 X 3/8 for the brick ledge as shown 7/S6.2 be <br /> attached to the wood framing?Also what will be done at these similar locations for flashing and <br /> drainage? <br /> These are very elaborate plans and I have spent 4 or 5 hours getting familiar with them and I hope I have <br /> caught everything that might come into question. I will be reviewing these plans more tomorrow so I will be in <br /> contact you as soon as possible if I have any more questions. <br /> Sincerely, <br /> City of Orono <br /> Roger Peitso <br /> Building Official <br /> City of Orono <br /> Phone: 952-249-4600 <br /> Direct: 952-249-4625 <br /> Email: rpeitsoCa�ci.orono.mn.us <br /> Fax: 952-249-4616 <br /> :���� <br /> i 3 <br /> .. <br /> , �p � -� ; <br /> � � , <br /> �•,,c,r���.'���"�`. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.