My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10351 - land alteration
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1060 Tonkawa Road - 08-117-23-13-0019
>
Permits/Inspections
>
2006-P10351 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:55 PM
Creation date
5/13/2020 11:58:12 AM
Metadata
Fields
Template:
x Address Old
House Number
1060
Street Name
Tonkawa
Street Type
Road
Address
1060 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723130019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. Lansings shall complete or arrange for completion of construction of a new <br /> driveway providing access to Lot 2, restoration of any damage to landscaping, vegetation or <br /> improvements on Lot 1 or Lot 2 and completion of all retaining walls,grading and landscaping work <br /> in the area adjacent to such new driveway, all in accordance with the plans and specifications <br /> attached to this Agreement as Exhibit B and incorporated herein. Those parts of the new driveway <br /> located within Lot 1 shall be constructed entirely within the New Driveway Easement described in <br /> the Declaration, and the new driveway shall be constructed in accordance with the terms and <br /> conditions of the Declaration. All of such work shall be completed as soon as reasonably possible <br /> after the date of this Agreement. Suddendorfs agree that Lansings and the contractors retained by <br /> Lansings, and subcontractors employed by such contractors, shall have access to Lot 2 for the <br /> limited purpose of completing the work described in this paragraph and in Exhibit B,but subject to <br /> and upon all of the terms and conditions stated in this Agreement. All of the work described in this <br /> paragraph and in Exhibit B hereto shall be completed at the sole cost and expense of Lansings. <br /> B. Lansings shall obtain all required permits and approvals from the City of <br /> Orono, Hennepin County, and any other governmental authority having jurisdiction over the <br /> performance of the driveway reconstruction work and access to Tonkawa Road for the performance <br /> and completion of such work, and shall provide copies or satisfactory evidence of such permits and <br /> approvals to Suddendorfs. <br /> C. If any public or private utility improvements are located within the area in <br /> which the new driveway and landscaping improvements are to be constructed, Lansings and the <br /> contractors retained by Lansings shall be solely responsible for assuring that no damage is done to <br /> any such utility improvements and that any required consents, permits or approvals are obtained <br /> c:\SuddendorflAgreement.clean.083006 - 3 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.