My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-P10351 - land alteration
Orono
>
Property Files
>
Street Address
>
T
>
Tonkawa Road
>
1060 Tonkawa Road - 08-117-23-13-0019
>
Permits/Inspections
>
2006-P10351 - land alteration
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:41:55 PM
Creation date
5/13/2020 11:58:12 AM
Metadata
Fields
Template:
x Address Old
House Number
1060
Street Name
Tonkawa
Street Type
Road
Address
1060 Tonkawa Rd
Document Type
Permits/Inspections
PIN
0811723130019
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br /> PLANS AND SPECIFICATIONS FOR NEW DRIVEWAY AND LANDSCAPING <br /> IMPROVEMENTS <br /> CONSTRUCTION PLAN <br /> Construction shall commence as soon as reasonably possible in accordance with the following: <br /> PHASE 1: SITE PREPARATION <br /> Remove trees and brush situated along the path of the Proposed Driveway, or where the grade <br /> will change and the trees would not reasonably survive the grade change. The only trees to be <br /> removed on 1070 lot are those situated where the driveway will be installed per the survey. <br /> PHASE 2: GRADING & DRAINAGE <br /> Fill low-lying areas with clean fill to raise the grade to support a driveway. Install a culvert in <br /> accordance with the Survey. Details of the culvert rip rap are described on attachment A to this <br /> Exhibit. A retaining wall will not be installed in the area of the culvert; the grade will be graded <br /> down in a natural and stable way, subject to James Suddendorfs' approval. Rip rap stonework <br /> shall be installed on both sides of the culvert. <br /> Drainage of the area to the north of the detached garage will be addressed by designing the <br /> driveway elevation at that point to be below the elevation of the garage doors. See survey <br /> elevations. <br /> James Suddendorf may, at his election, require installation of a natural boulder retaining wall in <br /> the area above the main 1070 lot parking area, as indicated on the attached Survey as "retaining <br /> wall A" Suddendorf will make this election by October 31, 2006. <br /> James Suddendorf may, at his election, require installation of a natural boulder retaining wall in <br /> the area of the 1060 lot north of the 1070 lot's detached garage, indicated on the attached Survey <br /> as "retaining wall B" This election to be made by October 31, 2006. <br /> James Suddendorf may, at his election, require installation of a natural boulder retaining wall in <br /> the area of the 1070 lot immediately after the new driveway comes onto the 1070 lot, as <br /> indicated on the attached Survey as "retaining wall C". This election to be made after <br /> preliminary grading has occurred, but not later than October 31, 2006. <br /> A gutter will be installed to augment the natural grading and to facilitate drainage away from the <br /> garage door, in the area north of the 1070 lot's detached garage. This location is depicted on the <br /> attached Survey as "gutter location". <br /> PHASE 3: BUILD DRIVEWAY <br />
The URL can be used to link to this page
Your browser does not support the video tag.