My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P10638 - demo
Orono
>
Property Files
>
Street Address
>
C
>
Cherry Place
>
1330 Cherry Place - 08-117-23-32-0026
>
Permits/Inspections
>
2007-P10638 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:44:04 PM
Creation date
5/12/2020 12:37:44 PM
Metadata
Fields
Template:
x Address Old
House Number
1330
Street Name
Cherry
Street Type
Place
Address
1330 Cherry Place
Document Type
Permits/Inspections
PIN
0811723320026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
‘4. Principal Dwelling Demolition Permit <br /> ZONING DISCLOSURE & DECLARATION <br /> • �saso <br /> To the property owner: Demolition of the principal dwelling structure on a <br /> property may automatically terminate certain rights which may have accrued to the property by virtue of the <br /> continued existence of that building. <br /> • Rebuilding on a substandard lot of record (i.e. a lot that does not meet the zoning district required lot <br /> area or width standards)will, with few exceptions, require variance approval by the City Council, and <br /> such approval is not automatic or guaranteed but requires that a hardship be demonstrated. <br /> • Additionally, all current zoning standards will have to be met by the new principal dwelling including <br /> setbacks, lot coverage by structures, hardcover(impervious surface), height limits, etc. <br /> • Where municipal sewer is not available, provision of two (2) sites for a conforming on-site sewage <br /> treatment system is mandatory. <br /> • Unless specifically approved by the City, all accessory structures must be removed at the time of <br /> principal dwelling demolition.This also applies to seasonal and permanent docks,which may not be re- <br /> installed until a new principal dwelling has reached the framing stage. <br /> The following information is presented for the purposes of advising the property owner of the implications of removal <br /> of the principal dwelling on the property: <br /> 1. Property Address: 1330 Cherry Place PIN# 08-117-23-32-0026 <br /> LR-1B Required Lot Area 1 ac. Required Lot Width 140' <br /> 2. Zoning District: Actual Lot Area ctual Lot Width 180 <br /> Lot area varianc.. is not required.* Lot width variance is/is not ,equired. <br /> *Lot area variance granted in#07-3261 expires 1/21/0: <br /> 3. Required Setbacks: Front Rear Side 10' Side Street 35' <br /> Lakeshore Lot: Lake(Front) 75' Street(Rear) 30' <br /> Average Lakeshore Setback: must be met6s not applicable. <br /> 4. Lot Coverage by Struc es: limited to 15% of lot area/ s oes not apply(lot area>2 acres) <br /> 5. Hardcover limitation.• are applicable re not applicable. 0-75'zone= 0%allowed <br /> 75-250'zone=25%allowed 250-500'zone=30%allowed 500-1000'zone=35%allowed <br /> 6.✓ Municipal sewer is available. Municipal sewer is not available;on-site system testing and design must be <br /> provided confirming that two conforming drainfield sites are available. <br /> 7. Wetland(s)present. Wetland is classified as" ". A_' buffer from the edge of wetland and a 20' structure <br /> setback from the buffer is required. **Talk to Planning Department Staff for additional requirements. <br /> The undersigned property owner hereby acknowledges receipt of the above information. Staff Initials <br /> / './ ------ <br /> Pro rty Owner's Signature Date <br /> Form ZDD—Revised 5-23-05 (Original: Street File; Copy: Property Owner) <br />
The URL can be used to link to this page
Your browser does not support the video tag.