My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-11-2015 Council Packet
Orono
>
City Council
>
2015
>
05-11-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 10:51:02 AM
Creation date
7/15/2015 10:44:14 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
365
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Date Application Received: NA <br />Date Application Considered as Complete: NA <br />60-Day Review Period Expires: NA <br />REQUEST FOR COUNCIL ACTION <br /> Date: May 4, 2015 <br />Item No. <br />Department Approval: Administrator Approval: Agenda Section: <br />Name: Mike Gaffron JML Planning <br />Title: Senior Planner <br />Item Description: #15-3722 Storm Water & Drainage Trunk Fee - Draft Ordinance & <br />Fee Schedule Amendment <br />List of Exhibits <br />A - Revised Draft Ordinance per 4/27 Council Discussion <br />B - Summary Ordinance <br />C - Draft Fee Schedule Amendment Ordinance <br />D - Existing Fee Schedule Page 6 <br />E - Council Draft Minutes 4/27/15 <br />F - Memo and Selected Exhibits dated 4/23/15 <br />The attached revised draft ordinance incorporates changes per the Council’s discussion at the <br />April 27 meeting. Those changes include: <br />1.Establishing a fee credit in the 2-acre and 5-acre zones for: <br />- acreage of newly-created wetland. <br />- acreage of stormwater ponding or similar improvements that provide additional <br />treatment benefits beyond what is required to treat the stormwater runoff from the <br />development site. <br />- acreage of conservation easements resulting from Conservation Design process. <br />2.The “perimeter buffer” credit for the 5-acre zone is removed. <br />3. The conversion to a per-lot fee basis for the 1/2-acre, 1-acre, 2-acre and 5-acre zones caps <br />the fee at the zoning lot size dry-buildable minimum area. As a result, existing wetlands <br />will no longer be included in the chargeable area, and therefore no fee credit is given for <br />the existing wetlands. <br />Note: Because the multi-family and high-density residential fees remain on a gross per-acre <br />basis, the following credits would still be allowed under the draft ordinance: <br />- all wetland acreage up to the delineation line <br />- acreage of stormwater ponding or similar improvements that provide additional <br />treatment benefits beyond what is required to treat the stormwater runoff from the <br />development site. <br />- acreage of conservation easements resulting from Conservation Design process <br />The draft ordinance section for revising the Fee Schedule has been removed from the Fee <br />ordinance and is attached as a separate Fee Schedule ordinance for adoption. <br />6 <br />Item #06 - CC Agenda - 05/11/2015 <br />File #15-3722 [Total Pages 28]
The URL can be used to link to this page
Your browser does not support the video tag.