Laserfiche WebLink
Item#09-CC Agenda-07/28/2014 <br /> 1330 Cherry Place Ravine Stabilization <br /> [Page 3 of 5] <br /> INGAUGE <br /> ENGINEERING AND TECHNOLOGY <br /> CLIENT/OWNER LIN YAN/CITY OF ORONO <br /> PROJECT RAVINE ESTABILIZATION <br /> ADDRESS 1330 CHERRY PLACE,ORONO, MN. <br /> MATERIAL ESTIMATE <br /> RAVINE STABILIZATION. 1330 CHERRY PLACE/CITY OF ORONO MN <br /> MATERIAL(UNIT) QUANTITY UNIT PRICE SUBTOTAL <br /> Vmax SC 250(6.5'x55.5`) 12.0 $ 121.00 $ 1,452.00 <br /> Staples(1000 unit box) 1.0 $ 39.00 $ 39.00 <br /> Double net straw blanket(8'x112.5') 4.0 $ 91.00 $ 364.00 <br /> Geotextile fabric riprap(12'x432') 1.0 $ 580.00 $ 580.00 <br /> Construction rocks (15 ton load) 1.0 $ 450.00 $ 450.00 <br /> Top soil black dirt (cu yard) 95.0 $ 34,00 $ 3,230.00 <br /> Seed mix MN 36-211(pounds) 25.0 $ 22.00 $ 550.00 <br /> Riprap class III Limestone(15 ton road) 6.0 $ 960.00 $ 5,760.00 <br /> Edge of lake river boulders (15 ton load) 1.0 $ 1,450.00 $ 1,450.00 <br /> TOTAL $ 13,875.00 <br /> 06/16/2014 <br /> Ingauge.eng@gmail,com 5780 Lincoln Drive,Suite 103 . 1 Edina,MN,55436 <br />