My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-00543 - gas furnace
Orono
>
Property Files
>
Street Address
>
E
>
Ethel Avenue
>
2697 Ethel Avenue - 20-117-23-24-0045
>
Permits/Inspections
>
2012-00543 - gas furnace
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:55:39 PM
Creation date
5/11/2020 8:16:32 AM
Metadata
Fields
Template:
x Address Old
House Number
2697
Street Name
Ethel
Street Type
Avenue
Address
2697 Ethel Avenue
Document Type
Permits/Inspections
PIN
2011723240045
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FOR CITY USE ONLY <br /> City of Orono <br /> :01.- 'rOS P.O.Box 66 Date Received: Permit# <br /> 2750 Kelley Parkway <br /> ,` <br /> ,, j` <br /> � Crystal Bay,MN 55323 Approved By: Amount$: <br /> A ),6, Phone(952)249-4600 Fax(952)249-4616 <br /> CITY OF ORONO—MECHANICAL PERMIT <br /> (All Commercial permits must be approved by the Building Official or Inspector and/or Fire Marshall) <br /> GENERAL INFORMATION <br /> I. You may apply for mechanical permits by mail or in person at the City offices. Applications will <br /> be reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT <br /> VALID UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE <br /> PERMIT CARD IS POSTED ON THE JOB SITE. <br /> 3. Mechanical Designs—Complete calculations,details and specifications are required for each <br /> heating,ventilation,humidification-dehumidification,and air conditioning installation including <br /> heat loss/heat gain calculation,design temperatures,equipment ratings and identification as to <br /> type,manufacturer and model. Data shall be presented on form provided. <br /> 4. When any new construction or remodeling is involved,a separate building permit must be <br /> obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call(952)249-4600. <br /> (24-48 hour notice required) <br /> 7. House Heating Test Record must be submitted before final. <br /> TYPE OF PERMIT <br /> (Check All That Apply) <br /> Residential ❑Commercial(Approval Required) <br /> •New ❑Additional ❑Repairs ■❑Replace <br /> Job Site/Owner Information: <br /> Site Address: 2697 Ethel Avenue <br /> Owner: Marc Cohen Mailing Address: 2597 Ethel Ave <br /> City: Orono Zip: 55391 <br /> Home Phone: (612) 978-4511 Alternate Phone: <br /> Contractor Information: <br /> Contractor: Total Comfort Contact Person: Tiffany <br /> 4000 Winnetka Ave Suite 100 MB 3665 <br /> Address: State Bond#: <br /> City: New Hope Zip:55427 Expiration Date: 09/30/12 <br /> Phone: . (763) 383-8383 Alternate Phone: (763) 383-8510 <br /> Travlers Insurance Co <br /> n Insurance—Current: <br />
The URL can be used to link to this page
Your browser does not support the video tag.