Laserfiche WebLink
Fees to be Charged `YE/SS NO <br /> Plan Review 1../7 <br /> State Surcharge <br /> Investigation Fee <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage 7X = $ <br /> Estimated Construction Value: $ i2 -61,M0'-- <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing ❑ Site1 Plumbing 0 Grading/Filling <br /> Poured Wall X Silt Fence/Erosion Control sa Mechanical 0 Fire <br /> Foundation Survey 0 Hardcover Removal W Fireplace zlit Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry Sewer Connection <br /> Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> Insulation <br /> As-Built Survey <br /> 3 Final <br /> O Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />