My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-00456 - building permit application
Orono
>
Property Files
>
Street Address
>
C
>
Casco Point Road
>
2635 Casco Point Road - 20-117-23-24-0031
>
Permits/Inspections
>
2018-00456 - building permit application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:54:50 PM
Creation date
5/8/2020 9:50:42 AM
Metadata
Fields
Template:
x Address Old
House Number
2635
Street Name
Casco Point
Street Type
Road
Address
2635 Casco Point Road
Document Type
Permits/Inspections
PIN
2011723240031
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Charged `YE/SS NO <br /> Plan Review 1../7 <br /> State Surcharge <br /> Investigation Fee <br /> Other(specify) <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage 7X = $ <br /> Estimated Construction Value: $ i2 -61,M0'-- <br /> Orono Inspections Required Work Requiring Separate Permits <br /> Footing ❑ Site1 Plumbing 0 Grading/Filling <br /> Poured Wall X Silt Fence/Erosion Control sa Mechanical 0 Fire <br /> Foundation Survey 0 Hardcover Removal W Fireplace zlit Water Connection <br /> 0 Framing 0 Other(specify) 0 Masonry Sewer Connection <br /> Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing 0 Septic <br /> Insulation <br /> As-Built Survey <br /> 3 Final <br /> O Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> ❑ See Builder Acknowledgement Form <br /> O Prior to release of escrow money an as-built survey and hardcover calculations must be submitted and approved. <br /> Updated: June 2017 <br /> z:\forms\plan review checklist 06-2017.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.