My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Minutes
Orono
>
City Council
>
Minutes
>
2010-2019
>
2014
>
01-13-2014 Council Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 9:51:22 AM
Creation date
7/15/2015 9:51:02 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, January 13, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 12 of 17 <br />(7. CAPITAL IMPROVEMENT PLAN (CIP), Continued) <br /> <br />Bremer asked if that cost would also include the landscaping around the entrances or whether it is just the <br />hardscape. <br /> <br />Struve stated he does not know the full amount at this time but that it is his belief it does contain some <br />landscaping costs. Struve indicated he will need to look into that a little more and get back to the City <br />Council on that item. <br /> <br />Levang asked if the 2016 public works parking lot is a full reconstruction or replacement. <br /> <br />Struve indicated it would be a full reconstruct of the road and that it is beyond the point of doing an <br />overlay. Struve stated the project may be able to be pushed back a year or two. <br /> <br />Levang asked if the seal coat in 2018 would be pushed back as well. <br /> <br />Struve indicated it is for the city hall and public works parking lot and that typically you do a seal coat <br />within three to five years of putting new asphalt down. <br /> <br />Levang asked how the 2014 imaging project is coming along. <br /> <br />Loftus stated that is a project that has not moved forward given the retirement of the previous City Clerk <br />and that Staff will need to refocus on that project in 2014. <br /> <br />Levang noted Page 7 lists a replacement Chevy pickup for 2016, and asked if that is simply a reflection of <br />how old the current vehicle is and what will be needed in the future. <br /> <br />Struve stated that is based on the use of that pickup and to his understanding it is approximately 15 to 20 <br />years old. Struve stated that vehicle does not get a lot of use so the useful life is able to be extended but <br />they are anticipating it will need to be replaced in 2016. <br /> <br />Levang asked if that is Orono’s portion of the improvements under the Long Lake Fire CIP. <br /> <br />Loftus indicated Orono pays approximately 85 percent of those costs. <br /> <br />Levang asked whether the Public Works Department is looking at obtaining a grant for the sidewalk <br />project. <br /> <br />Struve stated if grants and additional funding sources become available, that is a possible project that <br />could be done but it is dependent on obtaining outside funding sources. <br /> <br />Levang asked what the $12,000 for the Navarre Park-N-Ride project consists of. <br /> <br />Struve indicated that is stripping of the parking lot. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.