My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01014 - addn/remodel/repair
Orono
>
Property Files
>
Street Address
>
S
>
Shadywood Road
>
2380 Shadywood Road - 17-117-23-44-0111
>
Permits/Inspections
>
2017-01014 - addn/remodel/repair
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:46:19 PM
Creation date
5/6/2020 10:39:29 AM
Metadata
Fields
Template:
x Address Old
House Number
2380
Street Name
Shadywood
Street Type
Road
Address
2380 Shadywood Road
Document Type
Permits/Inspections
PIN
1711723440111
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fees to be Charged YES N4. <br /> Permit <br /> Plan Review //` <br /> State Surcharge (j* ' <br /> Investigation Fee (/ <br /> SAC=,Number of SAC Units r <br /> Other(specify) (/l <br /> Square Footage $ per Square Footage <br /> Basement X = $ <br /> 1st Floor X = $ <br /> 2nd Floor X = $ <br /> Garage Xr/ // = $ <br /> Estimated Construction Value: $ ,`� U1,, (� C 7—' <br /> Orono Inspections Required Work Requiring Separate Permits <br /> O Footing D Site Plumbing 0 Grading/Filling <br /> O Poured Wall 0 Silt Fence/Erosion Control eiSC Mechanical 0 Fire <br /> O Foundation Survey 0 Hardcover Removal 0 Fireplace 0 Water Connection <br /> O Framing 0 Other(specify) 0 Masonry 0 Sewer Connection <br /> O Waterproofing/Drain tile 0 Mfg. 0 Lawn Irrigation <br /> O Foundation Waterproofing 0 Other(specify) 0 Landscaping <br /> Framing <br /> Insulation <br /> O As-Built Survey <br /> `EC Final <br /> 0 Lathe Required State Permits <br /> O Other(specify) <br /> 0 Well Electrical <br /> REMARKS (in-house): <br /> OFFICIAL REMARKS -TO BE NOTED ON PERMIT AND INITIALLED: <br /> O See Builder Acknowledgement Form <br /> O Prior to release of escrow� �m/oney an as-built survey and hardcover calculations must be submitted and approved.af�� /0et (A44-94- k- SI eye) c. '9j'C�'v6 per 5.te 10/cm, <br /> Updated: October 2016 <br /> v:\forms\plan review checklist 10-2016.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.