My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00796 - sewer connection
Orono
>
Property Files
>
Street Address
>
F
>
Fairview Cottage Lane
>
1565 Fairview Cottage Lane - 07-117-23-43-0033
>
Permits/Inspections
>
2013-00796 - sewer connection
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:39:41 PM
Creation date
5/6/2020 8:19:26 AM
Metadata
Fields
Template:
x Address Old
House Number
1565
Street Name
Fairview Cottage
Street Type
Lane
Address
1565 Fairview Cottage La
Document Type
Permits/Inspections
PIN
0711723430033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> ❑ SAC Charge(2013 Rate=$2,435.00) $ <br /> (SAC Charge must accompany all sewer permit applications unless prepaid) <br /> (Orono City Staff can determine if applicable) <br /> ASew(If not prepaid,a sewer connection permit will not be issued) <br /> • '"innection/D': onnect/Repair($50.00/Per Stub)inches; material Schd 40 air tested; cast iron <br /> ❑ Water Connection/Disconnect/Repair($50.00/Per Stub) $ <br /> Pipe size inches;material Schd 40 air tested; copper <br /> ❑ Water Availability For Future Hook-Up to Water($50.00) $ <br /> Water Availability Explanation: <br /> Contractor installed line to inside of house for future hook-up. <br /> This line will be inspected by the Public Works Department. <br /> Required Before Water Connection Permit is Issued: <br /> 1. Issue Water Meter&Horn Permit <br /> 2. Any Additional Connection Fees Paid(If Applicable) <br /> Issue Water Connection Permit: <br /> 1. Collect Permit Fee&Issue Water Connection Permit <br /> 1. SUBTOTAL of Permit Requested: $ <br /> 2. STATE SURCHARGE $ 5.00 <br /> 3. POSTAGE&HANDLING(Only on Mail-In Applications) $ 2.00 <br /> 4. TOTAL PERMIT FEE(Add Lines 1-3 Above) $ <br /> ADDITIONAL INFORMATION—WATER METERS <br /> • WATER METERS must be picked up and paid for at Orono City Hall,these are on a separate permit. <br /> • WATER METERS must be set and sealed by Orono Water Department (952) 249-4600, upon <br /> completion of meter installation. <br /> The undersigned hereby applies to the City of Orono for issuance of a Utility Permit, agrees to do <br /> all work stibict.accondancwith the ordinances df.the City and the regulations of the State of <br /> Minnesota,and certifies that all statements made on this application are,true and correct. <br /> Applicant: Date: J <br />
The URL can be used to link to this page
Your browser does not support the video tag.