My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-00630 - demo
Orono
>
Property Files
>
Street Address
>
F
>
Fairview Cottage Lane
>
1565 Fairview Cottage Lane - 07-117-23-43-0033
>
Permits/Inspections
>
2013-00630 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:39:41 PM
Creation date
5/5/2020 12:55:37 PM
Metadata
Fields
Template:
x Address Old
House Number
1565
Street Name
Fairview Cottage
Street Type
Lane
Address
1565 Fairview Cottage La
Document Type
Permits/Inspections
PIN
0711723430033
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Page 2 of 2 2013-07-09 19:44:47(GMT) 17932292420 From.- Anthony Nitti <br /> ",. City of Orono o USE QNLY <br /> 7'W <br /> \ P.O.Box 66 Date Reeeive4 41 I'ecmit(i• e 13-Q6 O <br /> \ 2750 Kelley Parkway <br /> Crystal Bay,MN 55323 Amoun: $ SAC Crdit(952)249-4600 <br /> .> Hameowner(s)Signal 0'Yes <br /> Rex lutiof+ny)signed:©Yes ( �+om Requed <br /> Zoning Disetosu a Signed: Q YGs;©gone Rc ixed <br /> CITY OF ORONO -DEMOLITION PERMIT <br /> (All permits must be approved by the Building Official andlor Zoning Department) <br /> Type: ;:& Residential ❑ Commercial <br /> Site Address: 'cam( .P+V£�3�t (2° \--" <br /> Owner: t4.0-4 " ` Mailing Address: <br /> City: Zip: <br /> Phone: 1al- .. c'tC 1( .... t%1 1 Email: <br /> Contractor/App. :, —"e4,01‘L `. t -, t".� Contact Person: ''"' " e <br /> : <br /> Address: '40 ', A (c? State License#: <br /> City: .----6\0:,1->Z, Zip: _(__c)1 Expiration Date: <br /> vt <br /> Phone: -11.3- 44{;,1'-,;)65 ! Email: lu.%iwr . 4-544 ti `1nA w ,€44\. 001'." <br /> General Instructions: <br /> 1. You may be required to obtain other permits, i.e.: well abandonment, sewer, etc. <br /> 2. Work must not begin unless the permit card is available on the job site. <br /> 3. A 24-48 hour notice is required for all inspections. Call(952) 249-4600. <br /> 4. Sewer must be discontinued at the City service by qualified contractor before demo permit is <br /> issued. <br /> Demolition by means of: ❑ Manual Disassembly Eij,,Heavy Equipment ❑ Other <br /> Permit(s) Issued: ❑ Sewer Disconnection ❑Well Abandonment# <br /> In return for issuance of said Demolition Permit,the undersigned owner hereby agrees to: <br /> 1. Submit a survey, aerial photo or sketch showing all structures on the property. Note which <br /> structures are to be demolished. <br /> 2. Submit a survey, aerial photo or sketch showing proposed erosion control measures in <br /> accordance with Chapter 79, Construction Site Runoff Control. <br /> 3. Submit a copy of permit approval from the Minnehaha Creek Watershed District (MCWD). The <br /> City will not issue a demolition permit without a copy of the permit(s) from the MCWD or <br /> documentation stating permit(s)are not required. <br />
The URL can be used to link to this page
Your browser does not support the video tag.