Laserfiche WebLink
1/4 <br /> - Page of <br /> ALI `vers en.i_y_pn <br /> ■ <br /> SERvi E S Daily Soil Observation Notes <br /> Project No: _ t-) Date: / "' `' j t Report No: <br /> Project Name: 1'7'11 ���tv� r��i L-��t��t, Project Location: 3 ( ✓') <br /> Client: t 'v'..) Temp/Weather: tw , ,yv,,� h C% <br /> Project Manager: ;'r, ,,.t_ +--1040, Time Arrived: Departed: <br /> Sod Observation <br /> Areas Observed: ❑Building Pad [House Pad ❑ Roadway ❑ Parking/Walks ❑ Footing <br /> ❑ Proof Roll ❑ Other(describe) <br /> Soil report available? ❑ Yes No Report reviewed? ❑ Yes ( No Report prepared by: <br /> Benchmark: Benchmark evaluation: Benchmark provided by: <br /> Finish floor evaluation: Bottom of footing elevation: Bottom of excavation elevation: <br /> Approved plans available? Specified compaction: Fill source: or, <br /> �.J Sr`:4r, <br /> Oversizing appears adequate ❑ NA Yes ❑ No Soils observed agree with Soils report? O Yes O No <br /> Soils appear adequate for design loads? Yes ❑ No Proposed project bearing capacity(psf): <br /> Contractor notified of results? 'g Yes ❑ No Name of person notified: <br /> Was a copy of this report left on site? Yes ❑ No If so,whom was it submitted to? 01,-.1.c,,,; <br /> 12t...*) <br /> Notes/Comments. ,1/4 4 yea 4":J r . <br /> f1 s t- j 11" 1:z ‘r- k' Y c.5'Lo r, s C= c7.-) <br /> ) <br /> C% L-4— C.0 s%,1 (13)1k-k) P S S 3..'""' <br /> r <br /> Performed By: cls � Reviewed By: Date: <br /> This is a preliminary report and is provided solely as evidence that field observations and/or testing was performed.Observations and/or conclusions and/or <br /> recommendation conveyed in the final report may vary from,and shall take precedence over,those indicated in a preliminary report. <br /> 7 <br />