Laserfiche WebLink
0 <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 (1335 So Brown Rd) <br /> Crystal Bay, MN 55323 i. <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> ************************************************************************** <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. burning, well <br /> _ abandonmment, etc. - ` <br /> 2 . Work must not, begin unless the permit card is available on the job <br /> site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> *************************************************************************** <br /> JOB SITE ADDRESS: LDT I69 <br /> '1 Ly(D/AgDb i3rRR" L.AI'- - m 1 00E-7.0. 141 <br /> Occupancy Type: X Residential Commercial <br /> 343© NereN St+O/z Otk <br /> OWNER'S NAME: Phone: <br /> Mailing Address: City: <br /> CONTRACTOR'S NAME: (,0A1SIR'5 $ 5's2)G + Bus. No. : cI 4.Z- 1 o Cv° <br /> Mailing Address: /034c Vle-i.10(4) DR.. ''Sort Ili City: EDF.,N FR/Alain., <br /> ************************* ************************************************* <br /> Demolition if planned by means of: _manual disassembly Zheavy equipment <br /> burning (by fire department) <br /> s <br /> Permits Issued: <br /> Burning Fire`` Depa4tment <br /> Well Abandonmen +y <br /> In return' for issuance of said 'Demolition Permit, the undersigned owner <br /> hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time <br /> as demolition is complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the <br /> public rights-of-way unless specific prior approval is obtained in <br /> writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in <br /> accordance with all applicable PCA requirements. <br /> 5 . Water wells must be abandoned in accordance with State Health <br /> Department regulations. <br /> 6. Inspection required when all debris has been removed , before <br /> backfilling. <br /> 7. Within 5 working days of superstructure removal , a final inspection <br /> shall be requested. The site shall be left clean and clear of all <br /> debris, with any excavation filled with earth level with the adjacent <br /> ground elevation (except when such excavation is to be used as part of <br /> a new building and such new building is actually under construction). <br />