Laserfiche WebLink
Proposal Page 1 of 2 <br /> Volkenant Inc. <br /> 1030 County Road 83 763-479-1547 <br /> Established in 1968 Maple Plain, Minnesota 55359 612-518-0745 <br /> NAME: City of Orono 952-249-4625 Oct. 21, 2013 <br /> PO Box 66 <br /> Crystal Bay Mn 55323 <br /> Contact Person: Lyle Oman Plan Date: <br /> Job Name: House Demolition <br /> Location: 3320 Navarre Ln. Orono <br /> We hereby submit an estimate for the Demolition of a city owned house which will consist of the following items of work. <br /> 1. Disconnect utilities which include <br /> a. Disconnect water& sewer at the property line. <br /> b. Disconnect power and telephone lines at the power pole. <br /> 2. Remove and dispose of 10 appliances and 3 air conditioning units inside the house. <br /> 3. Remove and dispose of all rubbish inside of house and sheds. <br /> 4. Demolish and dispose of house and two small sheds on property. <br /> 5. Remove and dispose of concrete foundation and floors and sidewalks. <br /> 6. Slope existing dirt on lot into basement and provide for drainage. <br /> CONDITIONS: We will not be responsible for any underground facilities or utilities that are not located and marked.All Inspection, <br /> Testing,Permit,Traffic Control,Utility Access charges(SAC, WAC),and surveying fees will be charged extra. This Bid is based on dry soil <br /> conditions,if wet conditions exist there will be extra charges based on time and material. Removal of any Hidden or buried debris under job <br /> site will be charged extra.Temporary facilities are not included unless specified.Rock excavation,soil correction,underpinning,shoring or <br /> retention systems,and dewatering are all extra.Contaminated soils or Hazardous waste abatement removal and disposal,or import or export <br /> of any soils not listed will be charged extra.Normal clean up is included for our work only. We will not assume the responsibility for any <br /> restoration of turf,water pipes,trees,tree roots,sprinkler systems,erosion control,or hard surfaced driveways etc.unless prior noted.Winter <br /> condition,Frost braking or prevention will be charged extra. We reserve the right to add a fuel surcharge if the cost of fuel varies from the <br /> date of this contract till the actual work is done. We reserve the right to file a Mechanic's Lien if bill is not paid(in full)within 30 days of <br /> completion of work.If we do file a mechanic's lien after the bill has been unpaid for 30 days,you agree to pay all costs that we incur in filing <br /> such a lien,including attorney's fees. In the event we do not file a mechanic's lien or choose not to foreclose a filed mechanic's lien and legal <br /> action becomes necessary to collect the bill representing the work done under this contract,you agree to pay all costs which we incur in the <br /> collection of said bill, including attorney's fees.Volkenant Inc.reserves the right to remove equipment from the site at any time,regardless of <br /> contract default or termination. <br />