My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-13-2006 Council Packet
Orono
>
City Council
>
2006
>
03-13-2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2015 2:19:08 PM
Creation date
7/14/2015 2:18:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. �-P TESTING� �I11 C. Steven B. Schirmers • MPCA Cert.No. 627 <br /> � 951 Katydid Lane NE • St. Michael, MN 55376 • (612) 497-3566 <br /> _ FAX (612)-497-5011 <br /> State License#394 <br /> May 12, 1999 �ITS� �F ()R�NC! <br /> ��?1'TIC PERIti/t� , [�' ��� IE� <br /> INSI'ECTOR ��yya��„_,, <br /> DATE .�-� PERMIT I�IO.�, <br /> Arrric�vr:n ns s�;t��tT�rr:n <br /> Chris Diesen GY.7 nrr�r�ov►:n�vrrEi cc��i�zi:c�riors ns n�Trr� <br /> (� NO'f APPRO�'F:D-CORRF.C"f& RF.SU6�11'i' <br /> 1100 Townline Rd. �n«���,��,�»�„�5„rc Por yow•informatiun. All work sh.ill 6c don€: <br /> North Lot in ful!cotnpliancc�vith all upplicuUte scplic and zaniny cudc. <br /> Tirquircmrnts including itcius not spccil'icully nuted in this rcvi:."�a. <br /> Orono, Henn. Co., MN KI:EI�TH15 PLAN SG"('ON SCPE AT ALL TI,�iL'•S <br /> This on-site sewage treatment system is designed for a Type 1, three bedroom home, in <br /> accordance with the Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soil� on this site are SCS soils mapped - KkB - Kilkenny loam. The seasonally <br /> �aturated soils were located at 12" to 30" (mottled soil). Due to the seasonally saturated <br /> soils, a Pressurized Mound System will need to be installed to treat septic effluent. The <br /> bottom of the treatment area must be located at least 3' above the saturated soils. <br /> The soils at a depth of 12" have a percolation rate of10.0 mpi. <br /> A pumping chamber will need to be installed to tift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A waming device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be tumed over, <br /> just break up the sod, be sure not to over wark. <br /> All neighboring wells are located greater than 100' away from the proposed treatment <br /> area. <br /> 1 .�\ ` <br /> � ._ , <br /> � �� , . � <br />
The URL can be used to link to this page
Your browser does not support the video tag.