Laserfiche WebLink
Miiuiehaha Creek Watershed District has approved the stormwater <br /> m�nagement plans. <br /> c) Engineei�ing det�ils and design for proposed retaining w�lls exceeding 4 <br /> feet in height. <br /> d) Sufficient detail to meet the approval of the City�ngineer. <br /> 12. Easements & Covenants. <br /> a) Drainage Easements shall be granted to the City of Orono over the <br /> raingat•dens, as well as covenants to ensure their permanent maintenance. <br /> b) Drainage and Utility Easements shall be dedicated to the public on the <br /> final plat 10' along all exterior property lines, and 5' either side of interior <br /> property lines. <br /> c) Covenant shall be executed providing for permanent maintenance of ivy <br /> plantings on retaining walls in Outlot B. <br /> 13. Developers Agreement. Developer shall exectrte a Developer's Agreement for <br /> constructiou of improvements on the Property to ensure all site improvements are <br /> installed to the City's specifications and satisfaction. Said Developers Agreeulent <br /> may contain additional conditions not noted in this Preliminary Plat Approval <br /> resolution. No land alterations can take place until erosion control is established <br /> and the City is in receipt of 1 final grading and drainage plan. No improvements <br /> can begin until the City Engineer h�s approved all improvement plans. A Letter of <br /> Credit must accompany a fiilly execttted Developer's Agreeme�lt written to 150% <br /> of the cost of the proposed site improvements, including aiiy required <br /> landscaping, as outlined in the City �ngineer's Cost Estimate. No building <br /> perinits will be issl�ed uutil all drainage flcilities aud improvements have been <br /> inst111ed. <br /> P1ge 6 0l9 <br />