Laserfiche WebLink
4) An 8' wide bituminous surfaced public pedestriai�/bicycle trail shall be <br /> provided by the Developer within Lot 2 connecting from the public road to <br /> Glendale Drive (a portion of which will be in the City of Long Lake and <br /> will require Long Lake's approval). The City of Orono shall be <br /> responsible for maintenance of this public trail upon its completion and <br /> acceptance. Public easements including a suitable shoulder width shall be <br /> granted over said trail. Additionally, Developer shall grant a 10' trail <br /> easement along Willow Drive within Lots and 10 and within Outlots A <br /> and B, for fiiture public trail construction by the City. <br /> C. Utilities; Stormwater Management <br /> 5) Sanitary sewer and municipal water mains shall be installed by the <br /> Developer per plans subject to approval by the City Engineer. <br /> 6) The City will own and maintain the sanitary sewer and water mains within <br /> the development. The City will inspect these systems during their <br /> construction to ensure proper installation. Drainage and Utility Easements <br /> shall be granted to the City of Orono over all sewer and water utility lines <br /> and facilities, including the rights of way necessary to maintain saine. <br /> 7) Developer shall provide suitable evidence of Minnehaha Creek Watershed <br /> District (MCWD) approval of the stormwater management plan before <br /> Development Plan Approval will be granted. The stormwater drainage <br /> system will be owned and inaintained by a Homeowners Association to be <br /> established by the Developer. <br /> D. Wetland Impacts <br /> 8) Applicant shall demonstrate to the satisfaction of the City Council that all <br /> requiremeuts of the Mimiehaha Creek Watershed District as administrator <br /> of the WCA regulations on Orono's behalf, are complied with. <br /> Page8of14 <br />