My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
02-13-2006 Council Packet
Orono
>
City Council
>
2006
>
02-13-2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2021 11:00:59 AM
Creation date
7/13/2015 1:33:46 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
524
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#05-3131 <br /> Febuaryl0,2006 <br /> Page 3 <br /> Design Covenants Staff is generally OK with the design covenants provided by the applicant <br /> f0I' yOl1T last meeting. These may need soine tweaking, but could easily be incorporated into a <br /> more formal document for final plat approval. <br /> Minor Issues There are a small ntunber of issues remaining from past discussions or memos <br /> that need to be addressed: <br /> - Whether the churclz parcel, Lot 3, s{ioulrl be exenzpt from tlze SW&DT Fee. Staff <br /> would note that because the church property is being reduced in size, but the only change it <br /> undergoes is adding a trail along its southern border. City Engineer may wish to make a <br /> recominendation on this... <br /> - Sorrce setbacks slrown on the preliminary p/at need to be corrected(east line of Lot S <br /> proposed at 10', slioul�l revise to 15'; rcorth yard of Lot 3shoatld increase to 15'; west <br /> yarrl of Lot 6 shoacld revise to 1 S') <br /> - Will City or Developer maintain the trail segment from the new road to Glendale <br /> Drive? (Developer must build it,no past discussion on who should maintain it...) <br /> - A recoinmendation was made that a crosswalk to Hackberry Park from the new road be <br /> striped; will City be responsible for this cost? <br /> - The City Engineer has been asked to review the most recent plan submittal, and he <br /> should have comments for the February 13 meeting. <br /> Resolution - Concept Plan & Preliminary Plat Approval The attached Resolution is intended <br /> to incorporate all requirements and provisions discussed to date. Please review it carefully and <br /> feel free to add conditions that are missing or revise language to fit your intent. Once this <br /> document is adopted, the City is committed to approving this development when all the specified <br /> conditions are met. If Council feels there are pieces missing or inadequately addressed, now is <br /> the tiine to inake those changes. <br /> Staff Recommendation <br /> Staff reconlmends that Council grant General Concept Plan Approval and Preliminary Plat <br /> Approval per the findin�s and conditions of the attached Resolution, subject to any necessary <br /> revisions. <br /> COUNCIL ACTION R�QUESTED <br /> Adopt or amend the attached resolution. <br />
The URL can be used to link to this page
Your browser does not support the video tag.