My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-23-2006 Council Packet
Orono
>
City Council
>
2006
>
01-23-2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2015 1:04:53 PM
Creation date
7/13/2015 1:04:31 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i' <br /> � <br /> I <br /> IV. Cost Analysis <br /> Detailed cost estimates for the proposed improvements are presented in the appendices. These costs <br /> include a 5 percent contingency, a 20 percent allowance for design, inspection, legal, and <br /> administration costs, and a 5 percent allo�vance for capitalized interest and bonding costs durin� <br /> construction. The estimated costs shown in this report are based on 2005 unit prices and can be <br /> related to the ENR Construction Cost Index for December 2005 of 7,647. A summary of the <br /> estimated costs for the proposed improveinents is presented in Table 1. <br /> Table 1. Summary <br /> Description # of Services Figure # Estimated Cost Assessment <br /> Jamestown Road-Pressure Sewer 13 2 $125,960 $9,690 <br /> It is recommended that the sewer construction costs be assessed uniformly over the area to be <br /> served,based on the number of services to each property. The assessments shown above reflect this <br /> recommendation. <br /> Ja�nesto�t�n Road Sewei�-Revised g <br />
The URL can be used to link to this page
Your browser does not support the video tag.