My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-09-2006 Council Packet
Orono
>
City Council
>
1950-2024
>
2000-2009
>
2006
>
01-09-2006 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/13/2015 12:46:12 PM
Creation date
7/13/2015 12:45:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2335 West Higl�way 3G • St. Paul, MN 55113 <br /> Bonestroo <br /> ; Rosene Office: G51-G3G-4G00 • Fax: G51-G3G-1311 <br /> Anderiilc& www.bonestroacom <br /> Associates <br /> Engineers&Architects <br /> September 16,2005 ,;.�, <br /> °"��d. <br /> .�,, � <br /> Ms. .lanice Gundlach ,S'�p -���yd��. <br /> Planner �, �� " <br /> City of Orono 0 <br /> Post Offce Box 66 I���1�� ��o� <br /> Crystal Bay,MN 55323 �(�� <br /> Q <br /> Re: Trinity Lutheran Church <br /> File No. 000139-05000-0 <br /> Plat No. OS-3149 <br /> Dear Janice: <br /> We have reviewed the site plans dated 9-6-OS for the proposed improveme�rts at the Trinity Lutheran Church.The site is <br /> located in the northwest quadrant of the intersection of Brown Road North and HCSAH No. 6. The proposed <br /> improvements include parking lot improvements, a building addition, and storm se«�er improvements. We have the <br /> foilowing comments with regards to engineering matters: <br /> • The parking stalls shown are shorter than what the city generally requires.The typical minimum stall length is <br /> 19-feet with a minimum drive aisle width of 25-feet.We recommend the striping plan be revised to retlect these <br /> minimums. <br /> • The siYe was provided with a pressure sewer service stub a few years ago.To date the church has not connected <br /> to this system. It appears the intent is to connect to this syslem as patt of this improvement project.The plans <br /> should show the stub location and verify that it is their intent to connect to this system. The applicant should <br /> coordinate this connection witll the city public works department and review with the city any connections <br /> charges due. <br /> • Please see the attached cotninents froin Lance Hoffregarding storm sewer improvements and drainage issues. <br /> • We have estimated the costs for site improvements to be$228,586.00.The applicant should provide the city <br /> with a]etter of credit for 150%of this ainount or$342,879.00 prior to any work on site. <br /> If you have any questions please call me at(651) 604-4863. <br /> Yours very truly, <br /> BCT��S;ROC,ROSEN�,ANDERLIK sc ASSO�,IAT�S,IiJC. <br /> ___---- <br /> ��� <br /> Tom Kellogg <br /> Attachments <br /> Cc: Greg Gappa,City of Orono <br /> St. Paul, St. Cloud, Rochester, MN • Milwaul<ee, WI • Chicago, IL <br /> Affirmative Action/Equai Oppor[unity Employer and Employee Owned <br />
The URL can be used to link to this page
Your browser does not support the video tag.