My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2008 Council Work Session Packet
Orono
>
City Council
>
2008
>
10-14-2008 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 2:43:13 PM
Creation date
7/9/2015 2:43:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ..b.. . ... . <br /> Jim Murphy <br /> From: "Denny Eyler" <deyler@srfconsulting.com> <br /> To: "Jim Murphy" <jmurphy@goldengate.net> <br /> Sent: Thursday, October 09, 2008 3:15 PM <br /> Subject: Orono Roundabout <br /> I was finally able to talk to Scott Pedersen and he talked to his traffic operations people regarding what they <br /> wanted to see in the way of an update to the Intersection Control Evaluation report that accompanies the <br /> layout. I will forward his-email after this one. <br /> Here is what I understand is left to do and our estimated costs to complete those tasks. <br /> 1. Update the computer drafted layout with the latest changes to address the layout review memo as we <br /> discussed with Jim Grube. From that CAD drawing, we will plot the fastest paths and collect the other <br /> geometric inputs needed for updating the Rodel analysis. We will then plot the copies for submittal to Mn/DOT <br /> for review and then plot copies for the City and Hennepin County once Mn/DOT approves the layout. Once <br /> approval is obtained, we will also create electronic files of the layout, the ICE report and other pertinent items <br /> and copy them onto a CD or DVD and provide copies to both the City of Orono and Hennepin County for use at <br /> the time of the design of the turn back project. _ $1,800 <br /> We will update the ICE report as requested by Mn/DOT by redoing the Rodel analysis for the year of opening <br /> (2011) as a single lane, the year 2030 as a single lane and the year 2030 with two lanes each way for old TH <br /> 12. Update the Vissim files with the revised geometry and traffic forecasts. Make copies and distribute the <br /> updated ICE report. _ $1,800 <br /> Finalize the memo with the written responses to the layout review memo, finalize the layout history, and then <br /> also prepare a separate memorandum on the safety benefits of the project = $600 <br /> The total of these three items would therefore be $4,200. <br /> In addition, the work done in September (the bill that you got the other day was for work up to August 31) and <br /> the meeting on October 1 total another $4,900. Most this was for my time and included preparing the draft of <br /> the layout history memo, preparing the draft response to the layout review memo and then generating <br /> several drawings of alternatives, as well as attending the meeting at City Hall and also numerous e-mail and <br /> telephone communications with the various agencies. <br /> Therefore the total of the work to date that has not been billed and the work needed to get an update layout to <br /> Mn/DOT would total $9,100. We are assuming that this layout would then be approved since we are addressing <br /> all of the issues raised by Mn/DOT's layout review and known to us as of October 1, z008. <br /> These remaining tasks could be probably completed within one week after you give us the go ahead. <br /> As always, we would only bill you for the hours actually worked and we would not exceed this figure without <br /> your permission. <br /> 10/14/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.