My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2008 Council Work Session Packet
Orono
>
City Council
>
2008
>
10-14-2008 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 2:43:13 PM
Creation date
7/9/2015 2:43:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TH12 SEWER AND WATER SERVICE CONNECTIONS CHANGE ORDER <br /> ITEM 1&2: This gate valve and watermain was installed so water service could be <br /> maintained during construction in the Sugarwoods neighborhood. <br /> ITEM 3: Larger area disturbed than expected. <br /> ITEM 4: This T was listed as an 8x8 instead it was a 8x6 T. <br /> ITEM 5&6: This was buried and was unknown until exposed during construction. <br /> ITEM 7: This is required to operate valves deeper than 8'. <br />
The URL can be used to link to this page
Your browser does not support the video tag.