My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-14-2008 Council Work Session Packet
Orono
>
City Council
>
2008
>
10-14-2008 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2015 2:43:13 PM
Creation date
7/9/2015 2:43:10 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order Form �Bonestroo <br /> File No: 000139-08032-0 <br /> Project Name: Crystal Bay Business Center City Watermain Replacement <br /> Client: City of Orono <br /> Contractor: Burschvilie Construdion <br /> Prepared By: Jared Ward Date Needed: 10/13/08 <br /> Change Order No: 1 Draft or Final: <br /> If applicable,include: MSA No.,MSA(Non)Participating;MSA Item No's.,Projed No.,Time Extension,FmHA,MPCA, <br /> No.of Additional Copies(5+) Other <br /> Description of Work: <br /> Item 1: Additional crew time spent handiing contaminated material onsite. <br /> Item 2: Additional time and material costs to connect to existing 2" copper service and insulation for service to ABC and Ryan Building. <br /> Item 3: Connedion to additional copper service to building east of the Crystal Bay Business Center site. <br /> Bonestroo�.�CS.][Change Order Form-t jtw][VLM 027307] Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.