Laserfiche WebLink
Construction Cost Estimate- Geothermal System w/Heat Exchanger <br /> ,�. .�.---�--,� <br /> � <br /> ��s,�:.�l=="''�.,,; GEODCCti�11�CE <br /> -- Smolysf,ans�c�rn+�d� <br /> 5115 Industrial Street Maple Plain,MN 55359 Bus: (763)479-6325 Fax: (763)479-2183 <br /> �wt b�t Pr�qws�i <br /> May 21,2010 <br /> MEP and Associates Project: Orono city hall and PD <br /> Materials to include: <br /> Equipment: <br /> 1�Waterturnace,"Envision"�ton and under are single speed,3.5ton and over are 2-speed, <br /> geothermal heat pumps <br /> 1�Waterturnace pump packs <br /> 1�Return air boots with transitions <br /> 1�Cladlite slabs for units to sit on <br /> 1�Vision Pro thermostats <br /> Ductwork: <br /> "-Complete ductwork and fittings to connect all supply and return trunks to units <br /> Heat exchanger tied to city water supply: <br /> *-flat plate heat exchanger <br /> "-800'of horizontal boring with 3"HDPE supply and return lines <br /> *-pumping to units with P/T ports for servicing <br /> TOTAI,COST $178,��.�� <br /> UMR Geothermal,Inc. <br /> Chad Alsaker <br /> Design and Sales <br /> 005.10.01 Page 15 of 18 City of Orono <br /> May 28,2010 Geothermal HVAC Feasibility Study <br /> engineers � consultants � commissioning <br /> MEP Associates,LLC� 7607 Fquitable Drive,Eden Prairie,MN 55344�phone:952.224.4488 fax:952.224.4489�www.mepassociates.com <br />