My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-25-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
05-25-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:51:52 AM
Creation date
7/9/2015 1:38:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 24,2030 <br /> WM Extension from Old Hwy 12 and Willow Drive to Common Bond Site <br /> Preliminary Cost Estimate <br /> Plat No.10-3460 <br /> Cost Estimate: Watermain Extension Units Qty $/Unit Total <br /> Mobilization LS i $20,000.00 $20,000.00 <br /> Traffic Control LS 1 $3,000.00 $3,000.00 <br /> 18"Steel Casing-Jacked LF 80 $500.00 $40,000.00 <br /> 18"HDPE Casing-Directionally Drilled LF 200 $300.00 $60,000.00 <br /> 14"HDPE Watermain-Directionally Drilled LF 2150 $200.00 $430,000.00 <br /> Connect to Existing WM EA 1 $2,500.00 $2,500.00 <br /> Hydrant EA 2 $3,000.00 $6,000.00 <br /> 14"GV and Box EA 3 $3,000.00 $9,000.00 <br /> 6"GV and eox EA 2 $1,500.00 $3,000.00 <br /> 14"x 14"Tee EA 1 $1,500.00 $1,500.00 <br /> 14"x 6"Tee EA 2 $1,000.00 $2,000.00 <br /> 14"Plug EA 1 $500.00 $500.00 <br /> Erosion Control LS 1 $2,500.00 $2,500.00 <br /> Bituminous Street Patch SY 300 $100.00 $30,000.00 <br /> Restoration LS 1 $5,000.00 $5,000.00 <br /> Estimated Construction Cost $615,000.00 <br /> +5%Contingencies $30,750.00 <br /> +25%Legal and Engineering $153,750.00 <br /> +5%Bonding $30,750.00 <br /> TOTAL ESTIMATED COST $830,250.00 <br /> K:V139\139GEN\PLATS\Plats 3400-3499N39-3460 Common Bond\WM Prelim Cost Estimate 5-24-10.x1s <br />
The URL can be used to link to this page
Your browser does not support the video tag.