My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
03-23-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:51 AM
Creation date
7/9/2015 1:12:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4C. Comprehensive Sewer Policv Plan <br /> The Willow View sewer extension in 2000 served a new 25-lot residential <br /> development on the west side of Willow Drive. Two city projects to serve <br /> existing Orono neighborhoods were also completed in 2000, both discharging <br /> directly to the Long Lake system. Additional extensions to serve existing <br /> neighborhoods were completed in 2003-2006. The Stonebay sewer extensions in <br /> 2004 provided service to a new 157-unit residential development as well as 3 <br /> commercial outlots guided for primarily office use. <br /> Proposed MUSA Part XXXXVI is intended to incorporate the two existing <br /> residences at 5 and 15 Brown Road South into the MUSA. These two homes <br /> were connected to the Long Lake sewer system in 2001-2003 using two of the 50 <br /> "floating" sewer units allotted to the City in 1996, but inadvertently not included <br /> in the amendment that added 25 Brown Road South in 2007 (Part XXXXIV). <br /> Proposed MUSA Part XXXXX incorporates additional developable acreage just <br /> west of the Dumas Orchard property. This site which contains a single family <br /> residence and a closed sanitary landfill, is being reguided in this CMP to allow for <br /> multi-family residential development at a density of 6-7 units per acre. <br /> Existing and projected sewer connections to LS-60 are listed in Table 4C-7. <br /> 3. "DOWNSTREAM INTERCEPTORS": All trunk and lateral lines which <br /> directly discharge to the Orono-Long Lake Interceptor (MCES 7113 and 7113A) <br /> downstream from L.S. 59 or L.S. 60. These direct discharges are via City-owned <br /> and maintained lift stations pumping into the MCES forcemain at a limited <br /> number of locations. Construction occurred durinb 1980-1999 and includes the <br /> following lateral systems: <br /> a. Crystal Bay (1985) / BayRidge-Hartwood (1997) / Foxhill (1998) / <br /> Webber Hills (2000) Lateral System (Discharge to MCES 71li): MUSA <br /> Parts VIII, XVIII, XXIV, XXVII, and XXVIII. Future extensions of this <br /> lateral system will include MUSA Part XXXVIII and portions of Part <br /> XXXXII. <br /> b. Bracketts Poin� Lateral System (1997) (Discharges to MCES 7113) <br /> MUSA Part XXVI. Future lateral extensions will serve the southerly <br /> shore of Tanager Lake (MUSA Part XXXVII). <br /> c. Shoreline Drive Marinas Lateral System (1980) (Discharges to MCES <br /> 7113) MUSA Part VII. No eXtensions of this lateral are expected. <br /> d. Minnetonka Bluffs - Orono Lane - West Ferndale (1980) /Edgewood Hills <br /> (1999) Lateral System (Discharges to MCES 7113)(MUSA Parts VI and <br /> XXV) (Includes Woodhill Country Club flows from property in City of <br /> Wayzata). MUSA Part XXXVI allowed for additional individual property <br /> connections to this lateral system. <br /> City of Orono Community Management Plan 2008-2030 Page 4C-47 <br />
The URL can be used to link to this page
Your browser does not support the video tag.