My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-23-2010 Council Work Session Packet
Orono
>
City Council
>
2010
>
03-23-2010 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2019 10:09:51 AM
Creation date
7/9/2015 1:12:19 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CMP Part 4C. Comprehensive Sewer Policv Plan <br /> A lateral to serve 8 existing homes was constructed in 2003 along Old Long Lake <br /> Road (MUSA Part XXXXIII). Future connections in this area abutting Wayzata <br /> include the property at 875 Wayzata Boulevard (MUSA Part XI) and 10 existing <br /> homes in the Myrtlewood neighborhood (MUSA Part XXXXV). The property at <br /> 850 Wayzata Boulevard (proposed MUSA Part XXXXIX) is an existing <br /> Montessori school that is being re-guided in this Plan for Institutional use, and <br /> would also be served by the Myrtlewood system. <br /> Three additional homes are connected to a short extension of the Wayzata system <br /> on West Ferndale Road where a channel crossing was avoided by connecting to <br /> the Wayzata system. <br /> �. PLYMOUTH DIRECT CONNECTIONS. In addition to the 4 service areas, <br /> the City has one property directly connected to the Plymouth municipal system, <br /> St. Edwards Church on North Ferndale Road. This property is MUSA Part <br /> XXXXL No further connections to the Plymouth system are anticipated at this <br /> time. <br /> Table 4G10: Review of Orono Sewer Connections <br /> Plymouth Direct Connections <br /> Existing Projected Additional Connections (REC's) <br /> Connections <br /> MUSA Part/Description 2008 2010 ZO10-2020 Zp20-2030 <br /> (REC's) <br /> �� Add Total Add Total Add Total <br /> �� t. Edwa-ds Church - <br /> � ` (Propose MUSA Part XXXXI) 5 0 5 0 5 0 5 <br /> � � Total�ly uth Direct 5 0 5 0 5 p 5 <br /> � � Conn ctio EC's <br /> � f� Total Ply uth Direct Flow 0.5 0.5 0.5 0.5 <br /> � Rate (MG <br /> u <br /> Th municipal sanitary sewer design capacities listed in the 1977 <br /> Comprehensive Sewer Policy Plan (CSPP) plan were those ultimate <br /> capacities utilized for final design of the Orono-Long Lake interceptor. A <br /> major function of Orono's 1977 Comprehensive Sewer Plan was the engineering <br /> review and analysis of the ultimate design capacity of the Orono municipal sewer <br /> system as necessary criteria for the final design of MWCC's Orono-Long Lake <br /> Interceptor. The municipal system was analyzed by McCombs-Knutson <br /> Associates to determine the actual number of existing and potential users, the <br /> critical pipe size and slope, the lift station capacities and the expectable rates for <br /> average and peak flows. The study methods and raw data were assembled in the <br /> appendix section of the 1980 CSPP as they appeared in the 1977 CSP. The net <br /> system capacity was summarized in Table 4Gll. <br /> City of Orono Community Management Plan 2008-2030 Page 4G50 <br />
The URL can be used to link to this page
Your browser does not support the video tag.