My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Building Permit Application
Orono
>
Property Files
>
Street Address
>
G
>
Goldenrod Way
>
2860 Goldenrod Way - 33-118-23-24-0044
>
Misc
>
Building Permit Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:49:06 PM
Creation date
3/19/2020 2:52:02 PM
Metadata
Fields
Template:
x Address Old
House Number
2860
Street Name
Goldenrod
Street Type
Way
Address
2860 Goldenrod Way
Document Type
Misc
PIN
3311823240044
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Builder Acknowledgement Form <br /> Permit#2018-00448 <br /> Builder Representative Name: <br /> Permit Conditions: Initials <br /> "NOTE CHANGE" Before scheduling an exterior insulation and/or drain tile inspection, a <br /> foundation as-built survey must be submitted and approved by the City or a Stop Work order will <br /> be issued. <br /> Schedule a minimum of one hour for the framing inspection. <br /> Erosion control mechanisms must be installed and inspected by the City prior to any land <br /> disturbing activities. The contractor must provide a minimum of a 24 hour notice prior to <br /> inspection. <br /> Erosion control shall be installed and maintained throughout the entire project and must remain <br /> until vegetation has been established. (� <br /> A haul route shall be submitted to the City Engineer for approval and inspection prior to <br /> commencement of hauling from the site. The property owner shall be responsible for cleaning and C� <br /> repair of roadways for any adverse impacts. <br /> The water service connection must be protected during construction. Damage to the service lines <br /> will be the responsibility of the builder to repair prior to approval of the utility permit and issuance of <br /> the Certificate of Occupancy. <br /> Prior to the issuance of a Certificate of Occupancy an as-built survey and hardcover calculations ��— <br /> must be submitted and approved. <br /> In the event of winter or other extended unfavorable weather conditions (which prevent the <br /> completion of the exterior improvements and/or as-built survey) a Temporary Certificate of <br /> Occupancy (TCO) maybe necessary. A TCO requires up to a $10,000 escrow. <br /> ADVISORY COMMENTS <br /> Any changes to the exterior/landscaping improvements, i.e. patios, grading, sidewalks, retaining C� <br /> walls, etc. not currently shown on the approved survey and landscaping plan will require a <br /> separate Zoning Permit application to be submitted and approved prior to the work commencing. <br /> Any retaining walls that are over 4-feet in height or tiered walls not separated by twice of the height <br /> of the lower wall require engineered plans and a building permit to be submitted and approved (�C� <br /> prior to construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.