My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-16-2020 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2020-2029
>
2020
>
03-16-2020 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 2:20:04 PM
Creation date
3/17/2020 1:57:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
191
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br /> ORONO PLANNING COMMISSION <br /> Tuesday,February 18,2020 <br /> 6:00 p.m. <br /> Ressler stated that the Commission discussion are the items that Commissioner Erickson outlined from <br /> the staff report. He stated that he would also support of all three issues for consideration from the staff <br /> report. <br /> Bollis stated that he likes the overall layout and feels it makes sense to him. He stated that conservation <br /> design is the only thing that he would object to not going through. <br /> Thiesse asked if he would support doing conservation only on the front two lots. <br /> Bollis agreed that would make sense. <br /> Thiesse stated that Mr.Newell is improving the first part of the driveway and asked if the City had any <br /> jurisdiction on him changing the existing driveway since it is already there. <br /> Barnhart stated that it is already there, but generally, what the City tries to do with subdivisions is <br /> improve existing conditions and non-conformities,so they do look to make these types of improvements. <br /> Thiesse stated that the City are sticklers for this type of thing and encouraged Mr.Newell to be prepared <br /> to defend his decision. <br /> Mr.Newell stated that he is a landscape architect from Lake Tahoe so he has experience with watersheds <br /> and collection. He explained the reasons for the cul-de-sac placement to allow for a silt pond. <br /> Thiesse stated that he understands,but reiterated that it doesn't meet the City standards so he will need to <br /> be ready to defend it when the time comes. <br /> Ressler noted that this discussion may be moot if Lot 3 ends up being sold,but hoped that the feedback <br /> from the Commission was helpful to Mr.Newell. <br /> Mr.Newell stated that the discussion was very helpful to him. <br /> 7. LA19-000102 KEVIN CLARK, SAMBATEK, 135 ORONO ORCHARD ROAD NORTH, <br /> SKETCH PLAN,8:32 P.M.—9:18 P.M. <br /> Kevin Clark,Applicant,was present. <br /> Staff presented a summary of packet information. <br /> Bollis asked for details of the lot width for Lot 2. <br /> Barnhart stated that it is measured at the building setback line. <br /> Bollis asked if the City encountered this type of thing frequently with pie shaped or cul-de-sac lots. <br /> Barnhart stated that is true and the City has approved some subdivisions that have reduced width because <br /> of the nature of the cul-de-sac. He stated that he is not too alarmed by it,but wanted to call it to the <br /> Commission's attention. <br /> Page 17 of 30 <br />
The URL can be used to link to this page
Your browser does not support the video tag.