My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-08-2009 Council Work Session Packet
Orono
>
City Council
>
Agenda Packets - Historical
>
1999-2016 Agenda Packets - work sessions
>
2009
>
06-08-2009 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 3:02:03 PM
Creation date
7/8/2015 3:02:02 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� <br /> � � <br /> Orono City Council <br /> Committee of the Whole <br /> June 8, 2009, Following Council Meeting <br /> Orono City Council Chambers <br /> Present: Mayor Jim White, Council Members Cynthia Bremer, Doug Franchot, Lili McMillan and Jim <br /> Murphy; City Administrator Bill Wells, Finance Director Ron Olson,Assistant City <br /> Administrator for Long-Term Strategy Mike Gaffron, Police Chief Correy Farniok, City <br /> Engineer Tom Kellogg and City Clerk Lin Vee <br /> 1. Police Contract Formulas <br /> • Council discussed the recent Police Commission meeting where the formulas were presented. <br /> • Generally members of the Police Commission were in favor of the concept of police districts. <br /> • Formulas for Spring Park and Minnetonka Beach generate similar costs. <br /> • Use of the term "districts" may imply joint powers; staff will refer to areas as police zones or <br /> patrol areas. <br /> • Council prefers not to use property valuation as part of the formula. Staff will work on a <br /> formula to consider another variable�s) besides number of calls and population. <br /> • Administrative fees that affect all cities and have traditionally been paid for by Orono should <br /> become part of the base cost. <br /> • Consider transition period for the next year or two to a formula without valuation. <br /> • Staff will investigate how other cities are distributing costs and if property valuations are used. <br /> • The goal of the final contract is separate from how that goal is achieved. 5 year contract is <br /> preferable, but 3 year contract may be acceptable. <br /> 2. Engineer's Report <br /> A. Myrtlewood Utility Improvements Project—Water Assessment& Bid Award <br /> • Design of Myrtlewood project—Council directed the engineer to re-canvas the <br /> neighborhood to determine the current level of interest in the water and sewer project <br /> prior to the first public hearing; 5 owners were in favor of water, 9 in favor of sewer, 1 <br /> property in foreclosure. Alternates for extension of water to Montessori School and <br /> Comforts of Home were included with the bids. <br /> • If only 5 of the property owners are interested in water, the City would carry the costs for <br /> the water project until the remaining properties connect to the system. <br /> • The low bidder has verbally indicated that he plans to withdraw his bid. Bonestroo is <br /> waiting for written documentation. The 2"d lowest bidder is aware they may be awarded <br /> the project. <br /> • There is no change in the rules for installation of sewer pipes in easements regardless of <br /> whether Mn/DOT or the County owns the roadway. Casings to get sewer and water under <br /> old Highway 12 and under Wayzata Boulevard would be added costs. <br /> B. Extension of Sewer&Water to 875 Wayzata Boulevard West <br /> • Neither of the Wayzata Boulevard property owners were present at the public hearing for <br /> the Myrtlewood project. <br /> • Gaffron met with Comforts of Home and they have requested consideration to become part <br /> of the Myrtlewood project to extend sewer and water to their property. They would want <br /> the costs assessed over a 15 year period like other portions of the project. <br /> • Council directed the engineer to move forward with getting quotes for sewer and water to <br /> the Comforts of Home property so this additional work can be considered at the June 22nd <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.