Laserfiche WebLink
Dunn& McCuskey S&W Charges Analysis • <br /> April 13,2009 <br /> Page 6 ' <br /> were based on the City Engineer's Cost Estimate for Financial Guarantee dated June 12, <br /> 2006. The formulas for sewer and water connection charges were as follows: <br /> Williamson - Sewer Connection Fee Formula: <br /> 1) Sanitary Sewer Improvements: $35,450 $35,450 <br /> 2) 1/2 of Base maintenance roadway costs ' <br /> $10,000 common excavation <br /> 2,350 subgade excavation <br /> 11,440 Class V Base <br /> 5.000 fabric <br /> $28,790 x 0.5 14,395 <br /> 3) Restoration 4,000 c.y. @$2.50/c.y.x 0.5 5,000 <br /> $54,845 <br /> Sewer Connection Fee= $54,845/9 base dwelling units=$6,094/unit <br /> Williamson -Water Connection Fee Formula: <br /> 1) Water Main Improvements: $47,255 $47,255 <br /> 2) 1/2 of Base maintenance roadway costs: <br /> $10,000 common excavation <br /> 2,350 subgrade excavation <br /> 11,440 Class V Base <br /> 5.000 fabric <br /> $28,790 x 0.5 14,395 <br /> 3) Restoration 4,000 c.y. @$2.50/c.y.x 0.5 5,000 <br /> $66,650 <br /> Water Connection Fee=$66,650/9 base dwelling units=$7,406/unit <br /> It was concluded that these fees should be included in the 2008 Fee Schedule for the <br /> Glendale Cove sewer project. While we did not anticipate that there would be other � <br /> connections coming into this system, it would be appropriate that the connection fee be <br /> established now rather than later. These would then follow the standard annual inflationary <br /> increase program. Note that in addition to these connection charges, Williamson also paid a <br /> $1,600 Long Lake Sewer Connection Charge, a $1,500 Long Lake Water Connection <br /> Charge, and the MCES SAC Charge of$1,675; but not Long Lake hookup fees. <br /> Creekside Analysis. For Dunn and McCuskey to connect into the Creekside sewer system, <br /> the same basis and formula as used to calculate the Williamson fees would seem to be <br /> applicable. Based on the Engineer's Estimated Costs dated 2-11-05: <br /> Dunn & McCuskev- Sewer Connection Fee Formula: <br /> 1) Sanitary Sewer Improvements: $49,164 $49,]64 <br /> 2) l/2 of Base maintenance roadway costs <br /> $ 2,000 mobilization <br /> $14,000 common excavation <br /> 16,800 Class IV and V Base <br /> 2,250 fabric <br /> $35,050 35,050 <br /> 3) Restoration $10,000 5,000 <br /> $94,214 <br /> Sewer Connection Fee=$94,214/ 10 base dwelling units=$9,421 /unit <br /> (Base units=7 in subdiv.Plus 1 McCuskey and 2 Dunn) <br />