Laserfiche WebLink
r 7 <br /> systems and all other required permanent Erosion and Sediment control <br /> measures. Permanent Storm water pollution controls including, but not limited <br /> to ponds, vegetated buffers and structural measures shall be designed and <br /> constructed in accordance with other Chapters of the CITY Code and <br /> requirements of other agencies having jurisdiction. <br /> (iii)Narrative: Shall be provided that describes, at a minimum, the nature of <br /> construction activity, person(s) responsible for inspection and maintenance of <br /> Site Erosion and Sediment control including contact information, project <br /> phasing, schedules, along with the timing, installation and maintenance of <br /> Erosion and Sediment control measures and specifications necessary to carry <br /> out the project. <br />