My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2009 Council Work Session Packet
Orono
>
City Council
>
2009
>
01-13-2009 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:32:42 PM
Creation date
7/8/2015 2:20:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Cify oi Orono Page 4 <br /> Surface Water Management Plon Jc�nuary 8, 2009 <br /> Proposed Compensation <br /> We propase a fee of$18,400 for the work described above, Miscelfaneous expenses would be billed as <br /> encountered and are estimated at$500. The propased fee includes printing reports as described above. ff - <br /> additional reparts are desired, we would gladly print these for the City on a time and materiais basis. We <br /> could provide a cost quate for additional reports if requested. <br /> Hourly 1'ask: Deveiopment of a Phasphorus Reduction Plan <br /> As required by Minnehaha Creek Watershed District, Orana must develop a plan to reduce phosphorus in its <br /> surface water discharge by 230 Ibslyr over the 10-year span covered by the updated SWMP. This effort <br /> entails identifying potential projects and development cantrols and quantifying their benefit toward <br /> phosphorus reduction, We will also review projects since 2000 and apply phosphorus reduction obtained <br /> from these to the 236 pound target identified by the watershed. <br /> On January 7, 2009 we met with Minnehaha Creek Watershed District t�discuss the outline of the _ <br /> phosphorus reduction plan. We determined that Orono's best tourse of action entails a collaborative and - <br /> iterative pracess with the watershed. As we discussed, Orono will develop its initial draft through the - <br /> combined efforts of Orono and Bonestroo staff. Subsequent revision to that draft due to watershed <br /> comments may also involve the combined efforts of Orono and Bonestroo staff. <br /> The Phosphorus Reductian Plan will be a separate section of the SWMP but will be integrated with other <br /> applicable sections including the Assessment, Goals and Policies, and Implementation Sections. We <br /> propose that the Phosphorus Reduction Plan rely on modeling already completed by the watershed and not <br /> on new modeling performed by Orono. <br /> The level of effort needed to prepare a Phosphorus Reduction Pfan is somewhat uncertain. This <br /> consideration and the fact that City and Watershed staff resources will be used, ieads us to recommend � <br /> hourly compensation for this specific work item. <br /> Potential Supplemental Services <br /> As we discussed at our meeting, Orono might benefit by having a cohesive and single source of stormwater <br /> design guidance. A level one tlesign guide takes the form of a several page document outlining: <br /> 1, Submittal requirements <br /> 2, Design requirements for stormwater infrastructure <br /> 3. Performance measures(volume,water quality, and rate control}and how these are evaluated <br /> The design guide complements the SWMP by praviding more detail on specific elements of the stormwater <br /> system and by outlining how different parts of the system are analyzed, A level two design guide adds <br /> more introductary discuss+an on design and modeling theory—further cementing a consistent approach to <br /> design and analysis within Orono`s stormwater systern. We have an example of a level one and level two <br /> design guide that we could provide for your review. We could prepare Orono's design guidance for the <br /> follawing compensation: <br /> • Level 1: $2,540 <br /> • Level Z; $3,600 <br />
The URL can be used to link to this page
Your browser does not support the video tag.