My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2009 Council Work Session Packet
Orono
>
City Council
>
2009
>
01-13-2009 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/17/2019 1:32:42 PM
Creation date
7/8/2015 2:20:20 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> SWMP Update <br /> January 9,2009 <br /> Page 2 <br /> Funding. Base cost of the SWMP update is $18,900, with additional time as needed at standard <br /> Bonestroo hourly rates for work on the Phosphorus Reduction Plan. The Level 1 or Level 2 � <br /> Design Guidelines would be an additional $2,500 or $3,600 respectively should Council choose <br /> to add that to the mix. <br /> This mandatory update will be funded from the Stormwater Fund, which currently is at a level of <br /> approximately $727,000. The Stormwater fund has two input components: the quarterly <br /> Stormwater Utility Fees which generate approximately $120,000 per year; and the Stormwater & <br /> Drainage Trunk Fees paid by new development, which generates variable amounts from year to <br /> year depending on the level of development activity. For example, development of Stonebay <br /> Outlot A will generate approximately $25,000 in SW&D Trunk Fees. Note that expenditures <br /> from the Stormwater Fund have been minimal to date, and we have not made much progress <br /> toward implementing projects in the 5-year Stormwater CIP that was established in 2002. As <br /> part of the update, the Stormwater CIP will be revisited. <br /> COUNCIL ACTION REQUEST <br /> Staff requests Council authorization at the January 13 work session for Bonestroo to proceed <br /> immediately with work on the SWMP update and Phosphorus Reduction Plan, with formal <br /> action at your January 26 meeting. <br /> Additionally, Council should provide direction as to whether a Design Guide should be prepared <br /> at this time. <br />
The URL can be used to link to this page
Your browser does not support the video tag.