My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-25-2013 Council Work Session Packet
Orono
>
City Council
>
2013
>
11-25-2013 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 2:12:21 PM
Creation date
7/8/2015 2:12:08 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Current Rate Structure: Water Fees <br /> There are three primary components to the City's water utility revenues: <br /> • Fixed Charges <br /> � Usage Fees <br /> 1) Fixed Charges are a fixed quarterly fee based on the property location. The fixed charge is <br /> established to recover certain fixed expenses, such as the billing system, that the City must incur <br /> for a customer regardless of the amount of water consumed. The Navarre area is charged $30.11 <br /> per quarter, the Highway 12 and the Chevy Chase areas are charged $10.92 per quarter. The fee <br /> does not include any water usage. <br /> 2) Usage Fees are based on the metered use of water. Currently the billing structure is a fixed <br /> flat rate depending on property location. The Navarre area is charged$2.54 per thousand gallons, <br /> the Highway 12 is charged $3.54 per thousand gallons and the Chevy Chase area is charged <br /> $2.64 per thousand gallons. <br /> Pro-Forma Analysis Assumptions <br /> Following is a chart that summarizes the significant assumptions in the rate study. <br /> Water Utilit <br /> Growth and Utility No new residential connections. The estimated usage for existing residents <br /> Usage is anticipated to be at slightly belo�v the 2008 usage levels in order to be <br /> conservative. <br /> O eratin EX enses Increase 3%annually <br /> Capital Expenses Costs of improvements are inflated 5%per year. <br /> Future total capital improvements from 2010 to 2016 are estimated at an <br /> inflated value of$2.9M. <br /> Rate Structure Current billing structure is described above and is dependent on property <br /> location. Usage is charged a flat per thousand gallons rate per quarter plus <br /> a fixed quarterly charge depending on property location. <br /> The proposed rate structures on Appendix H moves to a three-tiered rate <br /> system for all end users within the City. Water users are treated the same <br /> in the Navarre and the Che Chase areas. <br /> A summary of the CIP can be found in Appendix E. <br /> Uriliry Rure Stu�iv PuBe� <br /> Cih�ojUror�o,bliiu�esotu Deeember, J009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.