Laserfiche WebLink
• Met with another developer regarding a subdivision or redevelopment of a property on <br /> West Lafayette; <br /> • Met with homeowner regarding finalization of the landscaping and hardcover to get a <br /> CO for a newly constructed home; <br /> • Meeting with a homeowner, and builder about an upcoming project involving variances <br /> and/or road vacation; <br /> • Met with the attorney for a property owner to discuss a potential commercial site plan <br /> review; <br /> • Met with a developer/planner about options for a large lakeshore property to be <br /> developed/sold in the near future: sewer, lot sizes/density, tree preservation, <br /> conservation design, dock access, etc; <br /> � Met with a builder about a CUP for a guest house; <br /> • Met with property owners about an incomplete building permit application; <br /> • Met with a property owner regarding a lot line rearrangement request; <br /> • Met with a property owner about a project involving wetland and a potential pool; <br /> • Met with an architect about a project involving variances for hardcover on a Tier 1 <br /> property; <br /> • Met with an architect/planner about options for expansion of an existing commercial <br /> property in Navarre; <br /> • Met with homeowners in the Crystal Bay neighborhood regarding variances for a <br /> detached garage construction; <br /> • Met with a property owner on Togo regarding wetlands and a detached garage; <br /> • Met with a property owner (& many phone calls) regarding/explaining hardcover and <br /> structural coverage limits on a takeshore property. <br /> • Met several times with 3 separate builders/architects regarding 3 separate building <br /> permits having issues with determining whether their proposal constitutes a half-story <br /> or full-story (this is a number of stories issue, not a height issue); <br /> • Met with a potential buyer and realtor/representatives about purchasing and finishing <br /> an unfinished commercial development; <br /> • Met several times with builder and surveyor regarding discrepancies between permit <br /> survey and foundation as-built survey. Issue has been resolved. <br /> • Met with a landscape contractor about a project involving grading with 75' of the lake; <br /> • Met with a landscaper to discuss the hardcover and permit requirements; <br /> • Met with a builder regarding a project for lake access stair replacement, tree removal <br /> and planting with the 75' zone; <br /> • Met with a homeowner and builder to discuss permit and code requirements for a new <br /> home on a vacant property; <br /> • Met with a builder regarding a proposal for a detached garage requiring variances; <br /> • Met with a designer about a columbaria project; <br /> • Met with an architect about a project to construct a home in the floodplain; <br /> • Met with a builder regarding issues with a new home permit—height, basement, <br /> grading; <br />