My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-26-2013 Council Work Session Packet
Orono
>
City Council
>
2013
>
08-26-2013 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2019 2:10:14 PM
Creation date
7/8/2015 1:43:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
142
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• The Long Lake Fire Department Advisory Board met on Wednesday, July 31St. The agenda is <br /> attached for your information along with the su pplemental materials that were distributed. <br /> In summary: <br /> o The 2014 Proposed Operating Budget has a 2.4% increase. This would increase Orono's <br /> contract price by $5,967 (1.73% increase over 2013). Chief Van Eyll will try to cut <br /> expenditures and present an amended budget by August 15th. Specifically, the Chief <br /> was asked to identify the savings from the sales tax exemption and to reexamine <br /> expenditures for out-of-state conferences. <br /> o The 2014 allocations show a slight increase in Orono's share from 82.73% up to 82.90%. <br /> o The LLFD Memorial 5K run raised $4,000-5,000. <br /> • Please find attached the CSAH 112 Project Advisory Committee Meeting Record for the <br /> meeting held July 18, 2013. <br /> � The no parking signs went up on Bayview Place earlier this week along with additional <br /> barriers to prevent parking. I received one phone call so far who questioned why this <br /> decision was made and why no notification was given to the surrounding neighborhood. <br /> This person wanted me to let the City Council know he is not in favor of the decision made <br /> and would request the Council reconsider their decision. <br /> • The contractor for Willow Drive will continue to finalize grading in the ditches and to place <br /> seed in these areas. There is a small delay caused because Xcel Energy has a power line too <br /> close to the surface in a portion of the ditch area. The contractor will have to wait until Xcel <br /> Energy is able to lower or replace this line. This should not cause significant delays in the <br /> placement of the final wear course. Attached is the weekty update. <br /> • Attached is a flyer for the Memorial Blood Drive, where the Police & Fire Departments will <br /> team up to give blood on Monday, August 19th from 2:00—6:00 pm at the Long Lake Fire <br /> Station. <br /> • 87 total citations were issued in the Police Department for the week of July 22 —July 28. <br /> Attached is the weekly summary police report. The first page is a summary of the citations <br /> issued for the week followed by the activity report, which includes the calls for service that <br /> were entered into RMS (Records Management System). Information that is not public has <br /> been redacted. Portions of some addresses have been redacted because in some instances <br /> it's acceptable to show a block range for an incident, but not the exact address. The activity <br /> report does not include all calls our officers were dispatched to, only the calls for which <br /> reports were written. Also not included are parking tickets, written warnings and assists to <br /> other agencies. Arrests will be noted by an asterisk next to the event. The arrested <br /> person's name will be filled in, along with age and city of residence. <br />
The URL can be used to link to this page
Your browser does not support the video tag.