My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Site Runoff Control
Orono
>
Property Files
>
Street Address
>
F
>
Fagerness Point Road
>
1981 Fagerness Point Road - 18-117-23-14-0005
>
Misc
>
Construction Site Runoff Control
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:46:33 PM
Creation date
3/16/2020 1:08:19 PM
Metadata
Fields
Template:
x Address Old
House Number
1981
Street Name
Fagerness Point
Street Type
Road
Address
1981 Fagerness Point Road
Document Type
Misc
PIN
1811723140005
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
View images
View plain text
0 o CONSTRUCTION SITE <br /> RUNOFF CONTROL <br /> www.cLorono.mn.us <br /> 952-249-4620 <br /> Your project is subject to Orono regulations regarding Construction Site Runoff Control. The <br /> purpose of these regulations is to protect wetlands and lakes. You are responsible for <br /> complying with these regulations. The following is an abbreviated summary of the <br /> regulations. <br /> 1. If your project requires a permit from the Minnehaha Creek Watershed District <br /> (MCWD) or Minnesota Pollution Control Agency (MPCA), you must also apply for and <br /> comply with those permit requirements. <br /> 2. Soil that accumulates behind a silt fence must be removed when it reaches a third of <br /> the way to the top of the fence. <br /> 3. All disturbed ground left inactive more than 14 days must be either temporarily or <br /> permanently stabilized (mulch, seed and mulch, sod, hydromulch, etc.) <br /> 4. You must provide sanitary facilities for all on-site workers, either a portable toilet or <br /> access to the permanent facilities. <br /> 5. Refuse and materials to be recycled must either be taken off site at the end of each <br /> work day or be placed in a dumpster. The dumpster must be emptied as necessary. <br /> 6. Vehicles must enter and leave the site by means of the existing driveway or the <br /> stabilized construction entrance. <br /> 7. Construction parking must be located on site, on a paved roadway, or an improved <br /> shoulder. <br /> 8. Any material tracked onto a roadway must be removed by the end of the work day. <br /> Removed material must be returned to the project site or removed, not just swept off <br /> the road. <br /> 9. Dumpsters and material may not be stored on a roadway. <br /> This is an information sheet. Every effort has been made to insure the accuracy of the information contained herein,- <br /> however, <br /> erein;however, if any information is not consistent with provisions of the City Code, the Code provisions will prevail. <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).