MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday, February 24, 2020 <br /> 6:00 o'clock p.m. <br /> bollards in the trail area,removing the bollards for the summer season and putting them in for the winter <br /> season.The restroom would be a one-seat vault toilet and would be ADA compliant. The shade structure <br /> being installed is a very simple design, using concrete or steel to make them as vandalism-proof as <br /> possible. There would be a mix of regular and ADA picnic tables,again installing something that is fairly <br /> indestructible/vandal-proof and using squared-off boulders for the seating. <br /> Edwards explained the cost estimates for work that needs to go out on bid, the work that can be done by <br /> City forces,and the administration and engineering costs.The total project currently is $526,000. The <br /> item estimates are conservative;a ten percent contingency was added to cover that.Once they get bids in, <br /> they will have a better idea of costs.He noted the costs are higher than previous estimates and funding <br /> goals. He indicated there was$80,000 allocated from the park dedication funds, which is the City's <br /> contribution to the project. They are looking for$120,000 from the Big Island Legacy Foundation and <br /> $200,000 from the DNR grant, which is a matching grant from the 120 and the 80, to come up with <br /> $400,000. The consulting firm Bolton &Menk has donated $10,000 towards the project, which will come <br /> out of project oversight costs. <br /> Walsh asked if the$10,000 amount could go towards the match. <br /> Edwards indicated it could, but only ten percent of the overall cost can be in the form of engineering and <br /> administrative costs.With$400,000, they can have$40,000 worth of administrative costs be associated in <br /> either the match or the grant dollars. They have$78,000 of administrative and design costs. <br /> Edwards said he is proposing to go out for bids in the next few weeks and bid the project with alternates, <br /> meaning everything will be bid on but bid separately.That allows the City to go through the bids and <br /> accept the base bid but say they don't have the funding available for the alternates or maybe only one or <br /> two of the alternates.The base bid would be all the things associated with the trails and signs. Alternate A <br /> would be for the vault toilet, and alternate B would be for the picnic structure and associated tables.That <br /> would allow for options at award time based on funding. <br /> Walsh and Crosby indicated that made sense to them. <br /> Edwards said he would hle to get an award approved at the end of March/beginning of April. <br /> Johnson asked if there were two vault toilets in the plan. <br /> Edwards said when they did the master plan, they identified locations for two potential toilets. As the <br /> design became more defined, they made a decision to put only one in the bid based on costs. <br /> Johnson commented the vault toilet next to the lake welcomes it to be kind of a public restroom versus <br /> one up in the lookout area,because if you're using the facility there,it's because you're using the trail. <br /> Johnson referenced the gates that would be used to keep snowmobiles off the trail and asked if it would <br /> still be accessible to people that want to hike or ride their bike. <br /> Walsh indicated the gates are predominantly to restrict vehicles and snowmobiles. <br /> Edwards said that is why they want the bollards to be removable, to make it more welcoming in the <br /> summertime. The bollards would be spaced 36 inches apart,which is plenty of width to walk and cross- <br /> Page 6 of 15 <br />