Laserfiche WebLink
C Cv-uw <br /> Evelyn M. Turner <br /> From: Evelyn M. Turner <br /> Sent: Monday, November 02, 2009 12:23 PM <br /> To: eric@stonewood.com' <br /> Cc: Scott Oberaigner <br /> Subject: Peters Residence -Addition of Storm Drain <br /> Eric: <br /> Tom Kellogg, City Engineer, reviewed the plan for the additional catch basin and storm <br /> drain pipe that you dropped off Friday. The concept is acceptable but the pipe must not <br /> extend to the lake. It must end at least 75 feet from the lake with the outlet designed to <br /> control erosion. If this requires grading, the grading must be more than 75 feet from the <br /> lake. Whatever is constructed should be shown on the as-built survey that will be <br /> required before the CO is issued. <br /> Tom also asked me to remind you that if you intend to lower the sewer manhole on the <br /> lakeside of the property you should first consult Scott Oberaigner, Utilities Supervisor. He <br /> will determine who will do the work. He can be reached at 952-249-4600. <br /> Evelyn Turner <br /> City Planner <br /> City of Orono <br /> 952-249-4623 <br /> 952-249-4616 (fax) <br />