My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1994-006178 - demo
Orono
>
Property Files
>
Street Address
>
B
>
Brown Road South
>
1275 Brown Road South - PID: 10-117-23-31-0024
>
Permits/Inspections
>
1994-006178 - demo
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:22:48 PM
Creation date
3/10/2020 11:40:24 AM
Metadata
Fields
Template:
x Address Old
House Number
1275
Street Name
Brown
Street Type
Road
Street Direction
South
Address
1275 Brown Road South
Document Type
Permits/Inspections
PIN
1011723310024
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
At, .ate►, <br /> CITY OF ORONO APPLICATION FOR DEMOLITION PERMIT <br /> P.O. Box 66 <br /> Crystal Bay, MN 55323 <br /> SPECIAL CONDITIONS & HOLD HARMLESS AGREEMENT <br /> General Instructions <br /> 1. You may be required to obtain other permits, i.e. burning, well. <br /> abandonmment, etc. <br /> 2. Work must not begin unless the permit card is available on the job <br /> site. <br /> 3. A 24 hour notice is required for all inspections. Call 473-7357. <br /> JOB SITE ADDRESS: <br /> Occupancy Type: Residential Commercial <br /> OWNER'S NAME: (�, ._ -�c� Phone: t�7 , '7 3 S-z <br /> Mailing Address: u <br /> ' Bus. No. : z7 <br /> CONTRACTOR'S NAME: --�,,.����-��, ���u �u ��� <br /> Mailing Address: 5 ti,,�, � '�,L;1 City: 3 r7 <br /> Demolition if planned by means of: _manual disassembly >Lheavy equipment <br /> burning (by fire de ar ment) <br /> Permits Issued: <br /> # Burning Fire Department <br /> # Well Abandonment <br /> In return for issuance of said Demolition Permit, the undersigned owner <br /> hereby agrees as follows: <br /> 1. The structure(s) shall be kept enclosed and/or secured until such time <br /> as demolition is complete. <br /> 2. Demolition debris will be kept off adjoining property and/or the <br /> public rights-of-way unless specific prior approval is obtained in <br /> writing for temporary use thereof. <br /> 3. Foundations shall be completely removed from the ground. <br /> 4. All demolition debris shall be completely disposed of off site in <br /> accordance with all applicable PCA requirements. <br /> 5. Water wells must be abandoned in accordance with State Health <br /> Department regulations. <br /> 6. Inspection required when all debris has been removed, before <br /> backfilling. <br /> 7. Within 5 working days of superstructure removal , a final inspection <br /> shall be requested. The site shall be left clean and clear of all <br /> debris, with any excavation filled with earth level with the adjacent <br /> ground elevation (except when such excavation is to be used as part of <br /> a new building and such new building is actually under construction). <br />
The URL can be used to link to this page
Your browser does not support the video tag.