Laserfiche WebLink
� <br /> � �11,'�`'�� <br /> � O 0���';; <br /> = �� ��T�i' of OR�l��► <br /> >> - <br /> '� � � ' r ''^ �" � Municipal Offices <br /> 1, I ` � I., �;� <br /> ��.'� r ~ �� Mailin Address: <br /> ' i'``�`° ' r i.``��'� G.!% Street Address g <br /> ������9 � ' ���'� 2750 Kelley Parkwa P.O. Box 66 <br /> \`��E� Orono, MN 55356 y Crystal Bay, MN 55323-0066 <br /> To: The Current Owner of Address � ��� ���Cx'`f� � <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewage treatment system at the above <br /> address has been inspected and the following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Health Threat <br /> Yes �No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brought into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as Non-Compliant <br /> Yes <br /> No � <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 <br /> December 31, 2010 <br /> Other � <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> 2 - !�-I-o� . The tank(s) should be cleaned through the manhole and <br /> not throu�h the inspection pipes, tlus allows for proper cleaning. <br /> Comments: <br /> w <br /> �� <br /> Inspector: Date of Inspection �S ��� <br /> Telephone(9�2)249-4600 • Fax (952)249-4616 <br /> www.ci.orono.mn.us <br />