My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Subdivision Only - Soil and Percolation Testing
Orono
>
Property Files
>
Street Address
>
W
>
Wyndmere Road
>
1150 Wyndmere Rd - 26-118-23-41-0013
>
Septic
>
Subdivision Only - Soil and Percolation Testing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:18:47 PM
Creation date
3/2/2020 10:49:07 AM
Metadata
Fields
Template:
x Address Old
House Number
1150
Street Name
Wyndmere
Street Type
Road
Address
1150 Wyndmere Road
Document Type
Septic
PIN
2611823410013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� Y <br /> Rusty Olson's--Soil and Percolation Testing <br /> Joseph J. Olson--MPCA License #810 <br /> 11481 Riverview Rd. NE, Hanover, MN 55341 <br /> (763) 498-8779 fax (763) 498-8290 <br /> February 20,2007 =STEM ISflEUM FN ORONO COPY <br /> Kem Hoppe 5— KQRQQK ANY M(W M NUMBER <br /> Proposed subdivision of OF KORM IWAUDATU THIS DMGN, <br /> 1150 Wyndemere Road <br /> Orono,Hennepin County <br /> This on-site Sewage Treatment System is partially designed for a Type 1,five-bedroom home in accordance <br /> with the Minnesota Pollution Control Agency Chapter 7080 and local ordinances. <br /> Once the house size,location and septic primary and future sites are chosen this design can be completed. <br /> The seasonally saturated soils were located at 14"-22"(mottled soil). Due to the seasonally saturated soils, <br /> a pressurized Mound System will need to be installed to treat septic effluent. The bottom of the treatment <br /> area must be located at least 3'above the saturated soils. <br /> The soils at a depth of 12"have a percolation rate averaging 14 MPI. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. The power supply and <br /> switches must be located outside the manhole and pumping chamber in a weatherproof enclosure. A <br /> warning device must be installed with a light and sound device;this is in case of a pump failure. <br /> Keep all heavy equipment off of the proposed treatment areas before and after construction. The <br /> treatment area must be fenced off before construction begins. This Design Is not valid&the System <br /> will need to be relocated if failure to protect the areas proposed for the On-Site Sewage Treatment <br /> systems occurs. <br /> Nothing other than gray water,(laundry,showers,ect.)human water&toilet tissue should be disposed of <br /> into the septic tanks. Garbage disposals are not recommended. Additives must no be used,they may cause <br /> harmful damage to your septic system. It is recommended that you pump the septic tank every year for 1 <br /> tank,every two years for two tanks. <br /> Sincerely, Cox,ONO COPY` Ct'TY OF ORONO <br /> SIM 116 PFR PI&AN �$ <br /> RATE PERMIT NCS <br /> AS Joseph J.Olson ff_j.,=APD WIT�OORItBCrtOti>i IK pol <br /> WT APPROVED-CORRECT A RBWBMI'f <br /> '!hese Comm euas sat fir ywr 1oh m-d a U send-6-01, M <br /> la f8a oomptisaw whb sli sppiW"rpdt am 01"t cob. <br /> Requ em au(aeWng hens as spedflediy rad is dkb t Aft <br /> 1KE'iEI TWA RAN UT am UT&AT ALL UmN <br /> ORONO COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.