Laserfiche WebLink
33 <br />i_ <br />0 <br />a <br />I <br />I 33 <br />STORMWATER POLLUTION PREVENTION PLAN <br />WILLIAIVI BOWMAN <br />IN THE NW 1/4 OF SW 1/4 OF SEC. 3-117-23 <br />� HENNEPIN COUNTY, MINNESOTA <br />............ ....................:......................................................................................................................................................................................... <br />.............•---..-------- <br />.......--------- <br />....... <br />............... <br />... <br />................................... <br />............... <br />........................ <br />-........... <br />-......... <br />.................. <br />................. <br />_ .... <br />A <br />I <br />II EXISTING <br />I <br />33 I 33 I <br />1�....,....WEST LINE OF I <br />NW 1/4 OF <br />I1/4 <br />I SW 1 /4 OF <br />SEC. 3-117 _ 23 <br />PROPOSED ELEVATIONS (VERIFY) <br />EXISTING HOUSE FLOOR = 962.6 <br />PROPOSED GARAGE FLOOR = 953.0 <br />PROPOSED BASEMENT FLOOR = 953.0 <br />ClSiteComp/DATA FILES/11 JOBS/1 <br />11-101 <br />t v %_j %.; %..# X_ vv <br />I <br />10 <br />I � <br />r, <br />U <br />�W <br />ERO-1C <br />RACK .VIN<1�L �:I C�`!� hJLIIUA �iIC <br />AROUSE <br />SOUTH LINE OF <br />NORTH 1/4 OF NW 1/4 <br />OF SW 1/4 OF <br />SEC. 3-117-23 <br />AC- VL.VV <br />,O <br />L l <br />6 <br />e - <br />w <br />L0 <br />r <br />O <br />Q <br />0 <br />m <br />(950.4) <br />City of Orono <br />Planning & Zoning Plan <br />O APPROVED WITH REVISIONS (see rotes) <br />E1 DENIED <br />'Stat'. ....._..._.. <br />EROSION AND SEDIMENT CONTROL <br />GENERAL NO I Eb: <br />1. PRIOR TO ANY CONSTRUCTION OR DEMOLITION, SILT FENCE AND FILTERS MUST BE INSTALLED. <br />E <br />2. ALL EROSION CONTROL INSTALLATIONS SHALL REMAIN IN PLACE AND BE MAINTAINED IN GOOD <br />CONDITION BY THE CONTRACTOR UNTIL THE SITE HAS BEEN RE -VEGETATED. CONTRACTOR MAY <br />REMOVE NECESSARY SILT FENCING/FILTERS TO CONSTRUCT ROADWAYS, WHILE MAINTAINING <br />ADEQUATE EROSION CONTROL IN ADJACENT AREA. <br />3. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY INSTALLATION AND PAVEMENT <br />CONSTRUCTION SO THAT THE GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON AFTER <br />DISTURBANCE. AREAS THAT WILL NOT BE SUBJECT TO CONSTRUCTION TRAFFIC SHALL BE SEEDED <br />(MnDOT MIX 190 @ 100#/AC AND MULCHED OR SODDED WITHIN SEVEN DAYS OF BEING DISTURBED. <br />4. CONTRACTOR SHALL INSTALL EROSION CONTROL DEVICES AS INDICATED ON THIS EROSION <br />CONTROL PLAN AND ANY ADDITIONAL REQUIRED, BASED ON MEANS, METHODS AND <br />SEQUENCES OF CONSTRUCTION, <br />5. BEST MANAGEMENT PRACTICES (BMP'S) REFER TO EROSION AND SEDIMENT CONTROL <br />PRACTICES DEFINED IN THE MPCA PROTECTING WATER QUALITY IN URBAN AREAS AND THE <br />MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING HANDBOOK. <br />6. ALL BMP'S SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS, <br />AND ESTIMATED DURATION OF USE. <br />7. ALL SEPTIC AREAS ARE TO BE FENCED OFF FOR PROTECTION. PROTECTION TO EXTEND A <br />MINIMUM OF 20' OUTSIDE OF SEPTIC AREAS. <br />8. INSTALL PERIMETER CONTROL DEVICES AROUND ANY DIRT STOCKPILE AREAS. <br />9. THE CONTRACTOR MUST SCHEDULE HIS OPERATIONS TO MINIMIZE THE AMOUNT OF DISTURBED <br />AREA AT ANY GIVEN TIME. THE CONTRACTOR MUST LIMIT THEIR ACTIVITIES TO THE GRADING <br />LIMITS SHOWN. <br />10. EROSION CONTROL BLANKETS MUST BE INSTALLED BETWEEN THE NWL AND HWL OF ANY <br />PROPOSED POND AFTER FINAL GRADING. <br />11. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER VEGETATIVE <br />COVER TO HELP FILTER RUNOFF. <br />12. ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT OPERATE EQUIPMENT <br />WHITHIN THE DRIPLINE, ROOT ZONES OR WITHIN THE TREE PROTECTION FENCE AREA. <br />13. SILT FENCE IS REQUIRED AT DOWN GRADIENT PERIMETER OF DISTURBED AREAS AND <br />STOCKPILES. PROTECT WETLANDS, WATERCOURSES AND ADJACENT PROPERTIES FROM <br />SEDIMENTATION AND STORMWATER RUNOFF. <br />14. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED <br />SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL <br />CONDITIONS, DICTATE, THE PERMITEE/CONTRACTOR SHALL ANTICIPATE THAT MORE BMP'S <br />WILL BE NECESSARY TO ENSURE EROSION AND SEDIMENT CONTROL ON THE SITE. DURING <br />THE COURSE OF CONSTRUCTION, IT IS THE RESPONSIBILITY OF THE PERMITEE/CONTRACTOR <br />TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES <br />AND/OR CLIMATIC EVENTS. <br />15. PROVIDE ADDITIONAL BMP'S OVER AND ABOVE THE MINIMUM REQUIREMENTS SHOWN ON <br />THE PLANS, AS MAY BE NEEDED TO PROVIDE EFFECTIVE PROTECTION OF WATER AND <br />SOIL RESOURCES. <br />16. OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SOIL SLOPES ON FINAL <br />PASS, LEAVING TRACK GROOVES PERPENDICULAR TO THE SLOPE. DO NOT BACK -BLADE. <br />LEAVE A SURFACE ROUGH TO MINIMIZE EROSION. <br />17. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED FROM EROSION WITHIN <br />15 DAYS OF SUBSTANTIAL COMPLETION OF GRADING IN THAT AREA. TEMPORARY SEED <br />AND MULCH SHALL COVER ALL EXPOSED SOILS IF GRADING COMPLETION IS DELAYED <br />LONGER THAN 15 DAYS. PERMANENT SEED AND MULCH IS REQIURES WITHIN 15 DAYS OF <br />COMPLETION OF FINAL GRADING. <br />18. GENERAL TEMPORARY SEED SHALL BE MNDOT MIX 190 @ 100 LBS. PER ACRE OR <br />APPROVED EQUAL. PERMANENT SEED SHALL BE MNDOT MIX 270 @ 120 LBS PER ACRE <br />OR APPROVED EQUAL. (PLANTING DATES PER SPEC 2575) MULCH SHALL BE MNDOT <br />TYPE 1 (CLEAN OAT STRAW) @ 2 TONS PER ACRE AND DISK ANCHORED IN PLACE OR <br />APPROVED EQUAL. FERTILIZER SHALL BE 80-80-80 NPK PER ACRE. (UNLESS P <br />RESTRICTIONS APPLY) AND INCORPORATED INTO THE SEED BED. <br />19. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY <br />DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED <br />OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED. <br />20. REPORT ALL FOUND FIELD TILES TO THE ENGINEER FOR EVALUATION. <br />21. CHANNELIZED RUNOFF FROM ADJACENT AREAS RUNNING THROUGH THE SITE SHALL BE <br />DIVERTED AROUND DISTURBED AREAS, IF PRACTICAL, DIVERTED RUNOFF SHALL BE <br />CONVEYED IN A MANNER THAT WILL NOT ERODE THE CONVEYANCE AT RECEIVING CHANNELS, <br />ALL TEMPORARY OR PERMANENT DRAINAGE CHANNELS MUST BE STABILIZED WITHIN <br />24 HOURS OF BEING CONNECTED TO A WATER OF THE STATE. SEDIMENT CONTROL IS REQUIRED <br />ALONG CHANNEL EDGES TO REDUCE SEDIMENT REACHING THE CHANNEL. <br />22. ALL ACTIVITIES ON THE SITE SHALL BE CONDUCTED IN A LOGICAL SEQUENCE TO MINIMIZE THE <br />AREA OF BARE SOIL EXPOSED AT ANY ONE TIME. <br />23. ALL DISTURBED GROUND LEFT INACTIVE FOR 14 OR MORE DAYS MUST HAVE TEMPORARY OR <br />PERMANENT STABILIZATION TEAR ROUND. <br />24. FOR SITES WITH MORE THAN TEN ACRES DISTURBED AT ONE TIME, OR IF A CHANNEL <br />ORIGINATES IN THE DISTURBED AREA, ONE OR MORE TEMPORARY OR PERMANENT <br />SEDIMENTATION BASINS SHALL BE CONSTRUCTED. EACH SEDIMENTATION BASIN SHALL HAVE A <br />SURFACE AREA OF AT LEAST ONE PERCENT OF THE AREA DRAINING TO THE BASIN AND AT <br />LEAST THREE FEET OF DEPTH AND CONSTRUCTED IN ACCORDANCE WITH ACCEPTED DESIGN <br />SPECIFICATIONS. SEDIMENT SHALL BE REMOVED TO MAINTAIN A DEPTH OF THREE FEET. THE <br />BASIN DISCHARGE RATE SHALL ALSO BE SUFFICIENTLY LOW AS TO NOT CAUSE EROSION ALONG <br />THE DISCHARGE CHANNEL OR THE RECEIVING WATER. <br />25. PERIMETER SEDIMENT CONTROL MEASURES SHALL BE PLACED ALONG ALL DOWN GRADIENT <br />PERIMETERS OF THE SITE. IF A CHANNEL OR AREA OF CONCENTRATED RUNOFF PASSES <br />THROUGH THE SITE, PERIMETER SEDIMENT CONTROL MEASURES SHALL BE PLACED ALONG <br />SITE DEWATERING PRACTICES: THE CHANNEL EDGES TO REDUCE SEDIMENT REACHING THE CHANNEL, ALL DOWN GRADIENT <br />1. WATER PUMPED FROM THE SITE SHALL BE TREATED BY TEMPORARY SEDIMENTATION BASINS, <br />GRIT CHAMBERS, SAND FILTERS, UPFLOW CHAMBERS, HYDROCYCLONES, SWIRL CONCENTRATORS <br />OR OTHER APPROPRIATE CONTROLS AS APPROPRIATE. ALL WATER FROM DEWATERING MUST <br />BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN <br />RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS <br />CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WELAND. <br />2. ALL DISCHARGE POINTS MUST BE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE <br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING <br />OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL <br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS. <br />FINAL STABILIZATION: <br />THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE. THE CONTRACTOR MUST <br />SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER FINAL STABILIZATION IS COMPLETE, <br />OR ANOTHER OWNER/OPERATOR (PERMITEE) HAS ASSUMED CONTROL OF ALL AREAS OF THE SITE <br />THAT HAVE NOT UNDERGONE FINAL STABILIZATION. FINAL STABILIIZATION CAN BE ACHIEVED IN ONE <br />OF THE FOLLOWING WAYS: <br />ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED <t4D ALL SOILS MUST BE <br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENS; 1`Y OF 70 PERCENT OVER <br />THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENT MEAN: NECESSARY TO PREVENT <br />SOIL FAILURE UNDER EROSIVE CONDITIONS AND: <br />A. ALL DRAINAGE DITCHES, CONSTRUCTED TO DRAIN WATER FROM T HE SITE AFTER CONSTRUCTIO <br />IS COMPLETE, MUST BE STABILIZED TO PRECLUDE EROSION; <br />B. ALL TEMOPRARY SYNTHETIC, AND STRUCTURAL EROSION PREVENTION AND SEDIMENT BMPS <br />(SUCH AS SILT FENCE) MUST BE REMOVED AS PART OF THE SITE FINAL STABILIZATION; <br />C. THE CONTRACTORS MUST CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM <br />TEMPORARY SEDIMENT BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY <br />MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING <br />WASHED BACK INTO THE BASIN, CONVEYANCES OR DRAINAGE WAYS DISCHARGING <br />OFF-SITE OR TO SURFACE WATERS. THE CLEAN OUT OF PERMANENT BASINS MUST BE <br />SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY. <br />PERIMETER SEDIMENT CONTROL MEASURES MUST INCLUDE A MAINTENANCE AND INSPECTION <br />SCHEDULE. <br />26. ANY SOIL OR DIRT STORAGE PILES CONTAINING MORE THAN TEN CUBIC YARDS OF MATERIAL <br />SHOULD NOT BE LOCATED WITHIN 25 FEET FROM A ROADWAY OR DRAINAGE CHANNEL. IF <br />REMAINING FOR MORE THAN 14 DAYS, THEY SHALL BE STABILIZED BY MULCHING VEGETATIVE <br />COVER, TARPS OR OTHER MEANS AND ENCLOSED WITH DOWN GRADIENT PERIMETER SEDIMENT <br />CONTROLS. PILES WHICH WILL BE IN EXISTENCE FOR LESS THAT 14 DAYS SHALL BE ENCLOSED <br />WITH PERIMETER SEDIMENT CONTROLS. <br />27, PIPE OUTLETS MUST HAVE ENERGY DISSIPATION INSTALLED WITHIN 24 HOURS OF CONNECTION <br />TO WATERS OF THE STATE. <br />SEDIMENT CONTROL PRACTICES: <br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS, <br />INCLUDING CURB AND GUTTER SYSTEMS AND STORM INLETS. <br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS <br />BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN <br />IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED. <br />3. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO <br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF <br />VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE <br />SEDIMENT CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS <br />N COMPLETED HOWEVER, SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT <br />PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE. <br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION <br />UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING INTO THE INLET HAVE BEEN ESTABLISHED. <br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCES OR OTHER EFFECTIVE SEDIMENT CONTROLS, <br />AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORM WATER CONVEYANCES SUCH AS <br />CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES. <br />ONO" copt <br />EROSION AND SEDIMENT CONTROL <br />INSPECTIO PROGRAM: <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING INSPECTIONS OF ALL EROSION <br />AND SEDIMENT CONTROL BMP'S ON SITE. INSPECTIONS AND RAINFALL ON SITE MUST BE <br />DOCUMENTED AND READILY AVAILABLE FOR REVIEW. INSPECTIONS ARE REQUIRED AS FOLLOWES: <br />1. ONCE EVERY SEVEN DAYS ON EXPOSED SOIL AREAS. <br />2. WITHIN 24 HOURS AFTER A ONE-HALF INCH OR GREATER RAIN EVENT OVER 24 HOURS. <br />3. ONCE EVERY 30 DAYS ON STABILIZED AREAS. <br />4. AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION ON FROZEN GROUND. <br />E�71RO ION AND SEDIMENT CONTROL <br />AINENANCE PROGRAM: <br />1. WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE BMP ON PERIMETER CONTROL DEVICES, <br />SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY. <br />2. IF THE PERIMETER CONTROL DEVICE IS NOT FUNCTIONAL IT MUST BE REPAIRED OR REPLACED <br />WITHIN 24 HOURS OF DISCOVERY. <br />3. TEMPORARY SEDIMENT BASINS SHALL BE MAINTAINED WHEN SEDIMENT REACHES 1/2 THE <br />OU`i LET HEIGHT OR 1/2 THE BASIN STORAGE VOLUME. BASINS MUST BE DRAINED OR SEDIMENT <br />REMOVED WITHIN 72 HOURS OF DISCOVERY. <br />4. SEDIMENT MUST BE REMOVED FROM PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY. <br />5. EROSION INTO STREETS. WETLANDS OR WATER BODIES: <br />A. IF ERODED SOILS (INCLUDING TRACKED SOILS FROM CONSTRUCTION ACTIVITIES) ENTER OR <br />APPEAR LIKELY TO ENTER STREETS, WETLANDS, OR OTHER WATER BODIES, PREVENTION <br />STRATEGIES, CLEANUP AND REPAIR MUST BE IMMEDIATE WITH THE APPROPRIATE APPROVALS <br />FROM THE DNR, MPCA, OR ANY OTHER STATE, FEDERAL, OR LOCAL AGENCIES AS NECESSARY. <br />THE OWNER SHALL PROVIDE ALL TRAFFIC CONTROL AND FLAGGING REQUIRED TO PROTECT <br />THE TRAVELING PUBLIC DURING CLEANUP OPERATIONS. <br />6. EROSION OFF-SITE: <br />A. IF EROSION BREACHES THE PERIMETER OF THE SITE, THE OWNER SHALL IMMEDIATELY <br />DEVELOP A CLEANUP AND RESTORATION PLAN, OBTAIN RIGHT -OF -ENTRY FROM THE ADJOINING <br />PROPERTY OWNER AND GET APPROPRIATE APPROVALS FROM ALL STATE, FEDERAL, AND <br />LOCAL AGENCIES AS NECESSARY. THEN IMPLEMENT THE CLEANUP AND RESTORATION PLAN <br />WITHIN 48 HOURS OF OBTAINING THE ADJOINING PROPERTY OWNER'S PERMISSION AND <br />APPROVAL FROM ANY APPROPRIATE STATE, FEDERAL, AND LOCAL AGENCIES. <br />CONSTRUCTION SITE PRACTICES: <br />1. WASTE AND MATERIAL DISPOSAL: <br />A. ALL WASTE, UNUSED BUILDING MATERIAL (INCLUDING GARBAGE DEBRIS, CLEANING <br />WASTES, WASTEWATER, TOXIC MATERIALS OR HAZARDOUS MATERIALS), COLLECTED <br />SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC, <br />FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER WASTES MUST BE PROPERLY <br />CONTAINED ON SITE AND DISPOSED OF OFF SITE, NOT ALLOWED TO BE CARRIED BY <br />RUNOFF INTO RECEIVING CHANNEL OR STORAGE SEWER SYSTEM. <br />2. HAZARDOUS MATERIALS: <br />A. OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED, <br />INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILL, LEAKS, OR OTHER DISCHARGE. <br />B. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. <br />C. CONCRETE WASH MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND RUNOFF MUST <br />MUST BE CONTAINED WITHIN THE DEFINED AREA. <br />D. STORAGE OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA <br />REGULATIONS. <br />3. LIQU'D WASTE: <br />A. ALL NON STORMWATER DISCHARGES (CONCRETE TRUCK WASHOUT, VEHICLE <br />WASHING, MAINTENANCE SPILLS, ETC. CONDUCTED DURING THE CONSTRUCTION <br />ACTIVITY MUST COMPLY WITH THE NEWEST VERSION OF THE STATE NPDES PERMIT. <br />4. SANITARY FACILITIES: <br />A. ACEQUATE ON-SITE SANITARY FACILITIES SHALL BE PROVIDED IN CONVENIENT <br />LOCATION(S) FOR ALL PERSONS WHO WORK ON THE SITE. <br />5. TRACKING: <br />A. EACH SITE SHALL HAVE GRAVELED ROADS, ACCESS DRIVES AND PARKING AREAS OF <br />SUFFICIENT WIDTH AND LENGTH TO PREVENT SEDIMENT FROM BEING TRACKED ONTO <br />PUBLIC OR PRIVATE ROADWAYS. <br />B. ANY SEDIMENT REACHING A PUBLIC OR PRIVATE ROAD SHALL BE REMOVED BY STREET <br />CLEANING BEFORE THE END OF EACH WORKDAY. <br />6. DRAIN INLET PROTECTION: <br />A. ALL STORM DRAIN INLETS SHALL BE PROTECTED DURING CONSTRUCTION WITH CONTROL <br />MEASURES AS APPROVED BY THE CITY. <br />B. THESE DEVICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION OF THE SITE. <br />C. A REGULAR INSPECTION AND MAINTENANCE PLAN SHALL BE DEVELOPED AND IMPLEMENTED <br />TO ASSURE THESE DEVICES ARE OPERATIONAL AT ALL TIMES. <br />7. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES MUST BE LIMITED TO A <br />DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED <br />OF. NO ENGINE DEGREASING IS ALLOWED ON SITE. <br />GRACING GENERAL NOTES: <br />1. PRIOR TO INITIAL GRADING, THE CONTRACTOR IS RESPONSIBLE TO MAKE SURE ALL REQUIRED <br />PERMITS AND APPROVALS HAVE BEEN OBTAINED. <br />2. ABSOLUTELY NO CONSTRUCTION, GRADING, OR FABRICATION SHALL BEGIN UNTIL: <br />A. THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS <br />AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES, <br />B. ALL NECESSARY BMP'S ARE INSTALLED. <br />3. GOPHER STATE ONE CALL (800) 252 - 1166, MUST BE NOTIFIED 48 HOURS PRIOR TO <br />START OF CONSTRUCTION. <br />4. ROCK CONSTRUCTION ENTRANCES (PER THE STANDARD DETAIL PLATE) MUST BE <br />PROVIDED AT ALL CONSTRUCTION SITE ACCESS POINTS. <br />5. TE,APORARY SEDIMENT POND(S) MUST BE ESTABLISHED IN INITIAL PHASE IN ORDER <br />TO CAPTURE RUNOFF DURING GRADING OF THE CONSTRUCTION SITE. <br />6. ALI. IMPROVEMENTS TO CONFORM TO CITY AND COUNTY'S LATEST STANDARDS <br />SPECIFICATION. <br />7. TOPSOIL MUST BE STRIPPED PRIOR TO ANY CONSTRUCTION, REUSE STOCKPILE ON SITE. <br />8. IMMEDIATELY FOLLOWING GRADING OF (3:1 OR GREATER) SIDE SLOPES AND DRAINAGE <br />SWALES, WOOD FIBER BLANKET OR OTHER APPROVED SOIL STABILIZING METHOD <br />(APPROVED BY ENGINEER) MUST BE APPLIED OVER SEED MIXTURE WITH A MINIMUM OF <br />4" *TOPSOIL. <br />9. ALL FINISHED GRADES MUST SLOPE AWAY FROM PROPOSED BUILDINGS AT MINIMUM <br />GRADE OF 2.0%. <br />10. CONTRACTOR IS REQUIRED TO KEEP A COPY OF THE EROSION CONTROL PLAN ON SITE, <br />AT ALL TIMES. <br />VLM <br />10 <br />ZzL0� <br />wOwO <br />U) Z LLJ <br />C;Z <br />��MI <br />>5P <br />ZwWI¢- <br />N <br />O CLU) <br />Z <br />LL <br />Q ui <br />QHziZ- <br />Q <br />J <br />"Qx <br />J <br />� <br />Lo <br />N <br />(D" <br />Q <br />OWZ <br />0 <br />J <br />CL Lu <br />�ZZ=m <br />>> <br />06 <br />QZ <br />J <br />� <br />m <br />KWON <br />F_ J D <br />_ uj <br />J 0: <br />d. <br />W <br />LO <br />W <br />z <br />J <br />_ <br />.. <br />m <br />z�Z <br />< <br />uj <br />ZWZ0 <br />U < <br />O>ieaz. <br />ii <br />V <br />R' <br />I.- <br />z <br />Iw- <br />0 <br />W Q zz9 <br />r N <br />r W <br />I W p G W <br />W (V z r- x <br />a <br />oN VVi �I o wo <br />W <br />O <br />wOwO <br />U) Z LLJ <br />1J <br />>5P <br />ZwWI¢- <br />w <br />O CLU) <br />m <br />Q ui <br />QHziZ- <br />Z <br />LL w O O <br />uii <br />LLLJ <br />0 <br />w <br />J <br />CL Lu <br />�ZZ=m <br />=Ww <br />F_oUz <br />F_ J D <br />_ uj <br />J 0: <br />uj <br />O <br />W <br />F-Wg0 <br />< <br />+v <br />U < <br />w~ZO <br />W a g LU <br />I.- <br />z <br />Iw- <br />0 <br />W Q zz9 <br />=jg4Q� <br />C) <br />z <br />Li <br />0 <br />Q <br />U <br />p <br />U <br />j�.rao.0 <br />�f <br />w <br />Q <br />0 <br />