<br />STORMWATER POLLUTION PREVENTION PLAN
<br />WILLIAIVI BOWMAN
<br />IN THE NW 1/4 OF SW 1/4 OF SEC. 3-117-23
<br />� HENNEPIN COUNTY, MINNESOTA
<br />............ ....................:.........................................................................................................................................................................................
<br />.............•---..--------
<br />.......---------
<br />.......
<br />...............
<br />...
<br />...................................
<br />...............
<br />........................
<br />-...........
<br />-.........
<br />..................
<br />.................
<br />_ ....
<br />A
<br />I
<br />II EXISTING
<br />I
<br />33 I 33 I
<br />1�....,....WEST LINE OF I
<br />NW 1/4 OF
<br />I1/4
<br />I SW 1 /4 OF
<br />SEC. 3-117 _ 23
<br />PROPOSED ELEVATIONS (VERIFY)
<br />EXISTING HOUSE FLOOR = 962.6
<br />PROPOSED GARAGE FLOOR = 953.0
<br />PROPOSED BASEMENT FLOOR = 953.0
<br />ClSiteComp/DATA FILES/11 JOBS/1
<br />11-101
<br />t v %_j %.; %..# X_ vv
<br />I
<br />10
<br />I �
<br />r,
<br />U
<br />�W
<br />ERO-1C
<br />RACK .VIN<1�L �:I C�`!� hJLIIUA �iIC
<br />AROUSE
<br />SOUTH LINE OF
<br />NORTH 1/4 OF NW 1/4
<br />OF SW 1/4 OF
<br />SEC. 3-117-23
<br />AC- VL.VV
<br />,O
<br />L l
<br />6
<br />e -
<br />w
<br />L0
<br />r
<br />O
<br />Q
<br />0
<br />m
<br />(950.4)
<br />City of Orono
<br />Planning & Zoning Plan
<br />O APPROVED WITH REVISIONS (see rotes)
<br />E1 DENIED
<br />'Stat'. ....._..._..
<br />EROSION AND SEDIMENT CONTROL
<br />GENERAL NO I Eb:
<br />1. PRIOR TO ANY CONSTRUCTION OR DEMOLITION, SILT FENCE AND FILTERS MUST BE INSTALLED.
<br />E
<br />2. ALL EROSION CONTROL INSTALLATIONS SHALL REMAIN IN PLACE AND BE MAINTAINED IN GOOD
<br />CONDITION BY THE CONTRACTOR UNTIL THE SITE HAS BEEN RE -VEGETATED. CONTRACTOR MAY
<br />REMOVE NECESSARY SILT FENCING/FILTERS TO CONSTRUCT ROADWAYS, WHILE MAINTAINING
<br />ADEQUATE EROSION CONTROL IN ADJACENT AREA.
<br />3. THE CONTRACTOR SHALL SCHEDULE SITE GRADING, UTILITY INSTALLATION AND PAVEMENT
<br />CONSTRUCTION SO THAT THE GENERAL SITE CAN BE MULCHED AND RE -SEEDED SOON AFTER
<br />DISTURBANCE. AREAS THAT WILL NOT BE SUBJECT TO CONSTRUCTION TRAFFIC SHALL BE SEEDED
<br />(MnDOT MIX 190 @ 100#/AC AND MULCHED OR SODDED WITHIN SEVEN DAYS OF BEING DISTURBED.
<br />4. CONTRACTOR SHALL INSTALL EROSION CONTROL DEVICES AS INDICATED ON THIS EROSION
<br />CONTROL PLAN AND ANY ADDITIONAL REQUIRED, BASED ON MEANS, METHODS AND
<br />SEQUENCES OF CONSTRUCTION,
<br />5. BEST MANAGEMENT PRACTICES (BMP'S) REFER TO EROSION AND SEDIMENT CONTROL
<br />PRACTICES DEFINED IN THE MPCA PROTECTING WATER QUALITY IN URBAN AREAS AND THE
<br />MINNESOTA CONSTRUCTION SITE EROSION AND SEDIMENT CONTROL PLANNING HANDBOOK.
<br />6. ALL BMP'S SELECTED SHALL BE APPROPRIATE FOR THE TIME OF YEAR, SITE CONDITIONS,
<br />AND ESTIMATED DURATION OF USE.
<br />7. ALL SEPTIC AREAS ARE TO BE FENCED OFF FOR PROTECTION. PROTECTION TO EXTEND A
<br />MINIMUM OF 20' OUTSIDE OF SEPTIC AREAS.
<br />8. INSTALL PERIMETER CONTROL DEVICES AROUND ANY DIRT STOCKPILE AREAS.
<br />9. THE CONTRACTOR MUST SCHEDULE HIS OPERATIONS TO MINIMIZE THE AMOUNT OF DISTURBED
<br />AREA AT ANY GIVEN TIME. THE CONTRACTOR MUST LIMIT THEIR ACTIVITIES TO THE GRADING
<br />LIMITS SHOWN.
<br />10. EROSION CONTROL BLANKETS MUST BE INSTALLED BETWEEN THE NWL AND HWL OF ANY
<br />PROPOSED POND AFTER FINAL GRADING.
<br />11. WHEREVER POSSIBLE, PRESERVE THE EXISTING TREES, GRASS AND OTHER VEGETATIVE
<br />COVER TO HELP FILTER RUNOFF.
<br />12. ALL TREES NOT LISTED FOR REMOVAL SHALL BE PROTECTED. DO NOT OPERATE EQUIPMENT
<br />WHITHIN THE DRIPLINE, ROOT ZONES OR WITHIN THE TREE PROTECTION FENCE AREA.
<br />13. SILT FENCE IS REQUIRED AT DOWN GRADIENT PERIMETER OF DISTURBED AREAS AND
<br />STOCKPILES. PROTECT WETLANDS, WATERCOURSES AND ADJACENT PROPERTIES FROM
<br />SEDIMENTATION AND STORMWATER RUNOFF.
<br />14. THE BMP'S SHOWN ON THE PLANS ARE THE MINIMUM REQUIREMENTS FOR THE ANTICIPATED
<br />SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL
<br />CONDITIONS, DICTATE, THE PERMITEE/CONTRACTOR SHALL ANTICIPATE THAT MORE BMP'S
<br />WILL BE NECESSARY TO ENSURE EROSION AND SEDIMENT CONTROL ON THE SITE. DURING
<br />THE COURSE OF CONSTRUCTION, IT IS THE RESPONSIBILITY OF THE PERMITEE/CONTRACTOR
<br />TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY CONSTRUCTION ACTIVITIES
<br />AND/OR CLIMATIC EVENTS.
<br />15. PROVIDE ADDITIONAL BMP'S OVER AND ABOVE THE MINIMUM REQUIREMENTS SHOWN ON
<br />THE PLANS, AS MAY BE NEEDED TO PROVIDE EFFECTIVE PROTECTION OF WATER AND
<br />SOIL RESOURCES.
<br />16. OPERATE TRACK EQUIPMENT (DOZER) UP AND DOWN EXPOSED SOIL SLOPES ON FINAL
<br />PASS, LEAVING TRACK GROOVES PERPENDICULAR TO THE SLOPE. DO NOT BACK -BLADE.
<br />LEAVE A SURFACE ROUGH TO MINIMIZE EROSION.
<br />17. ALL AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED FROM EROSION WITHIN
<br />15 DAYS OF SUBSTANTIAL COMPLETION OF GRADING IN THAT AREA. TEMPORARY SEED
<br />AND MULCH SHALL COVER ALL EXPOSED SOILS IF GRADING COMPLETION IS DELAYED
<br />LONGER THAN 15 DAYS. PERMANENT SEED AND MULCH IS REQIURES WITHIN 15 DAYS OF
<br />COMPLETION OF FINAL GRADING.
<br />18. GENERAL TEMPORARY SEED SHALL BE MNDOT MIX 190 @ 100 LBS. PER ACRE OR
<br />APPROVED EQUAL. PERMANENT SEED SHALL BE MNDOT MIX 270 @ 120 LBS PER ACRE
<br />OR APPROVED EQUAL. (PLANTING DATES PER SPEC 2575) MULCH SHALL BE MNDOT
<br />TYPE 1 (CLEAN OAT STRAW) @ 2 TONS PER ACRE AND DISK ANCHORED IN PLACE OR
<br />APPROVED EQUAL. FERTILIZER SHALL BE 80-80-80 NPK PER ACRE. (UNLESS P
<br />RESTRICTIONS APPLY) AND INCORPORATED INTO THE SEED BED.
<br />19. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PROPERLY
<br />DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED
<br />OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED.
<br />20. REPORT ALL FOUND FIELD TILES TO THE ENGINEER FOR EVALUATION.
<br />21. CHANNELIZED RUNOFF FROM ADJACENT AREAS RUNNING THROUGH THE SITE SHALL BE
<br />DIVERTED AROUND DISTURBED AREAS, IF PRACTICAL, DIVERTED RUNOFF SHALL BE
<br />CONVEYED IN A MANNER THAT WILL NOT ERODE THE CONVEYANCE AT RECEIVING CHANNELS,
<br />ALL TEMPORARY OR PERMANENT DRAINAGE CHANNELS MUST BE STABILIZED WITHIN
<br />24 HOURS OF BEING CONNECTED TO A WATER OF THE STATE. SEDIMENT CONTROL IS REQUIRED
<br />ALONG CHANNEL EDGES TO REDUCE SEDIMENT REACHING THE CHANNEL.
<br />22. ALL ACTIVITIES ON THE SITE SHALL BE CONDUCTED IN A LOGICAL SEQUENCE TO MINIMIZE THE
<br />AREA OF BARE SOIL EXPOSED AT ANY ONE TIME.
<br />23. ALL DISTURBED GROUND LEFT INACTIVE FOR 14 OR MORE DAYS MUST HAVE TEMPORARY OR
<br />PERMANENT STABILIZATION TEAR ROUND.
<br />24. FOR SITES WITH MORE THAN TEN ACRES DISTURBED AT ONE TIME, OR IF A CHANNEL
<br />ORIGINATES IN THE DISTURBED AREA, ONE OR MORE TEMPORARY OR PERMANENT
<br />SEDIMENTATION BASINS SHALL BE CONSTRUCTED. EACH SEDIMENTATION BASIN SHALL HAVE A
<br />SURFACE AREA OF AT LEAST ONE PERCENT OF THE AREA DRAINING TO THE BASIN AND AT
<br />LEAST THREE FEET OF DEPTH AND CONSTRUCTED IN ACCORDANCE WITH ACCEPTED DESIGN
<br />SPECIFICATIONS. SEDIMENT SHALL BE REMOVED TO MAINTAIN A DEPTH OF THREE FEET. THE
<br />BASIN DISCHARGE RATE SHALL ALSO BE SUFFICIENTLY LOW AS TO NOT CAUSE EROSION ALONG
<br />THE DISCHARGE CHANNEL OR THE RECEIVING WATER.
<br />25. PERIMETER SEDIMENT CONTROL MEASURES SHALL BE PLACED ALONG ALL DOWN GRADIENT
<br />PERIMETERS OF THE SITE. IF A CHANNEL OR AREA OF CONCENTRATED RUNOFF PASSES
<br />THROUGH THE SITE, PERIMETER SEDIMENT CONTROL MEASURES SHALL BE PLACED ALONG
<br />SITE DEWATERING PRACTICES: THE CHANNEL EDGES TO REDUCE SEDIMENT REACHING THE CHANNEL, ALL DOWN GRADIENT
<br />1. WATER PUMPED FROM THE SITE SHALL BE TREATED BY TEMPORARY SEDIMENTATION BASINS,
<br />GRIT CHAMBERS, SAND FILTERS, UPFLOW CHAMBERS, HYDROCYCLONES, SWIRL CONCENTRATORS
<br />OR OTHER APPROPRIATE CONTROLS AS APPROPRIATE. ALL WATER FROM DEWATERING MUST
<br />BE DISCHARGED IN A MANNER THAT DOES NOT CAUSE NUISANCE CONDITIONS, EROSION IN
<br />RECEIVING CHANNELS OR ON DOWNSLOPE PROPERTIES, OR INUNDATION IN WETLANDS
<br />CAUSING SIGNIFICANT ADVERSE IMPACT TO THE WELAND.
<br />2. ALL DISCHARGE POINTS MUST BE ADEQUATELY PROTECTED FROM EROSION AND SCOUR. THE
<br />DISCHARGE MUST BE DISPERSED OVER NATURAL ROCK RIPRAP, SAND BAGS, PLASTIC SHEETING
<br />OR OTHER ACCEPTED ENERGY DISSIPATION MEASURES. ADEQUATE SEDIMENTATION CONTROL
<br />MEASURES ARE REQUIRED FOR DISCHARGE WATER THAT CONTAINS SUSPENDED SOLIDS.
<br />FINAL STABILIZATION:
<br />THE CONTRACTOR MUST ENSURE FINAL STABILIZATION OF THE SITE. THE CONTRACTOR MUST
<br />SUBMIT A NOTICE OF TERMINATION (NOT) WITHIN 30 DAYS AFTER FINAL STABILIZATION IS COMPLETE,
<br />OR ANOTHER OWNER/OPERATOR (PERMITEE) HAS ASSUMED CONTROL OF ALL AREAS OF THE SITE
<br />THAT HAVE NOT UNDERGONE FINAL STABILIZATION. FINAL STABILIIZATION CAN BE ACHIEVED IN ONE
<br />OF THE FOLLOWING WAYS:
<br />ALL SOIL DISTURBING ACTIVITIES AT THE SITE HAVE BEEN COMPLETED <t4D ALL SOILS MUST BE
<br />STABILIZED BY A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENS; 1`Y OF 70 PERCENT OVER
<br />THE ENTIRE PERVIOUS SURFACE AREA, OR OTHER EQUIVALENT MEAN: NECESSARY TO PREVENT
<br />SOIL FAILURE UNDER EROSIVE CONDITIONS AND:
<br />A. ALL DRAINAGE DITCHES, CONSTRUCTED TO DRAIN WATER FROM T HE SITE AFTER CONSTRUCTIO
<br />IS COMPLETE, MUST BE STABILIZED TO PRECLUDE EROSION;
<br />B. ALL TEMOPRARY SYNTHETIC, AND STRUCTURAL EROSION PREVENTION AND SEDIMENT BMPS
<br />(SUCH AS SILT FENCE) MUST BE REMOVED AS PART OF THE SITE FINAL STABILIZATION;
<br />C. THE CONTRACTORS MUST CLEAN OUT ALL SEDIMENT FROM CONVEYANCES AND FROM
<br />TEMPORARY SEDIMENT BASINS THAT ARE TO BE USED AS PERMANENT WATER QUALITY
<br />MANAGEMENT BASINS. SEDIMENT MUST BE STABILIZED TO PREVENT IT FROM BEING
<br />WASHED BACK INTO THE BASIN, CONVEYANCES OR DRAINAGE WAYS DISCHARGING
<br />OFF-SITE OR TO SURFACE WATERS. THE CLEAN OUT OF PERMANENT BASINS MUST BE
<br />SUFFICIENT TO RETURN THE BASIN TO DESIGN CAPACITY.
<br />PERIMETER SEDIMENT CONTROL MEASURES MUST INCLUDE A MAINTENANCE AND INSPECTION
<br />SCHEDULE.
<br />26. ANY SOIL OR DIRT STORAGE PILES CONTAINING MORE THAN TEN CUBIC YARDS OF MATERIAL
<br />SHOULD NOT BE LOCATED WITHIN 25 FEET FROM A ROADWAY OR DRAINAGE CHANNEL. IF
<br />REMAINING FOR MORE THAN 14 DAYS, THEY SHALL BE STABILIZED BY MULCHING VEGETATIVE
<br />COVER, TARPS OR OTHER MEANS AND ENCLOSED WITH DOWN GRADIENT PERIMETER SEDIMENT
<br />CONTROLS. PILES WHICH WILL BE IN EXISTENCE FOR LESS THAT 14 DAYS SHALL BE ENCLOSED
<br />WITH PERIMETER SEDIMENT CONTROLS.
<br />27, PIPE OUTLETS MUST HAVE ENERGY DISSIPATION INSTALLED WITHIN 24 HOURS OF CONNECTION
<br />TO WATERS OF THE STATE.
<br />SEDIMENT CONTROL PRACTICES:
<br />1. SEDIMENT CONTROL PRACTICES MUST MINIMIZE SEDIMENT FROM ENTERING SURFACE WATERS,
<br />INCLUDING CURB AND GUTTER SYSTEMS AND STORM INLETS.
<br />2. SEDIMENT CONTROL PRACTICES MUST BE ESTABLISHED ON ALL DOWN GRADIENT PERIMETERS
<br />BEFORE ANY UPGRADIENT LAND DISTURBING ACTIVITIES BEGIN. THESE PRACTICES SHALL REMAIN
<br />IN PLACE UNTIL FINAL STABILIZATION HAS BEEN ESTABLISHED.
<br />3. THE TIMING OF THE INSTALLATION OF SEDIMENT CONTROL PRACTICES MAY BE ADJUSTED TO
<br />ACCOMMODATE SHORT-TERM ACTIVITIES SUCH AS CLEARING OR GRUBBING, OR PASSAGE OF
<br />VEHICLES. ANY SHORT-TERM ACTIVITY MUST BE COMPLETED AS QUICKLY AS POSSIBLE AND THE
<br />SEDIMENT CONTROL PRACTICES MUST BE INSTALLED IMMEDIATELY AFTER THE ACTIVITY IS
<br />N COMPLETED HOWEVER, SEDIMENT CONTROL PRACTICES MUST BE INSTALLED BEFORE THE NEXT
<br />PRECIPITATION EVENT EVEN IF THE ACTIVITY IS NOT COMPLETE.
<br />4. ALL STORM DRAIN INLETS MUST BE PROTECTED BY APPROPRIATE BMPS DURING CONSTRUCTION
<br />UNTIL ALL SOURCES WITH POTENTIAL FOR DISCHARGING INTO THE INLET HAVE BEEN ESTABLISHED.
<br />5. TEMPORARY SOIL STOCKPILES MUST HAVE SILT FENCES OR OTHER EFFECTIVE SEDIMENT CONTROLS,
<br />AND CANNOT BE PLACED IN SURFACE WATERS, INCLUDING STORM WATER CONVEYANCES SUCH AS
<br />CURB AND GUTTER SYSTEMS, OR CONDUITS AND DITCHES.
<br />ONO" copt
<br />EROSION AND SEDIMENT CONTROL
<br />INSPECTIO PROGRAM:
<br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONDUCTING INSPECTIONS OF ALL EROSION
<br />AND SEDIMENT CONTROL BMP'S ON SITE. INSPECTIONS AND RAINFALL ON SITE MUST BE
<br />DOCUMENTED AND READILY AVAILABLE FOR REVIEW. INSPECTIONS ARE REQUIRED AS FOLLOWES:
<br />1. ONCE EVERY SEVEN DAYS ON EXPOSED SOIL AREAS.
<br />2. WITHIN 24 HOURS AFTER A ONE-HALF INCH OR GREATER RAIN EVENT OVER 24 HOURS.
<br />3. ONCE EVERY 30 DAYS ON STABILIZED AREAS.
<br />4. AS SOON AS RUNOFF OCCURS OR PRIOR TO RESUMING CONSTRUCTION ON FROZEN GROUND.
<br />E�71RO ION AND SEDIMENT CONTROL
<br />AINENANCE PROGRAM:
<br />1. WHEN SEDIMENT REACHES 1/3 THE HEIGHT OF THE BMP ON PERIMETER CONTROL DEVICES,
<br />SEDIMENT MUST BE REMOVED WITHIN 24 HOURS OF DISCOVERY.
<br />2. IF THE PERIMETER CONTROL DEVICE IS NOT FUNCTIONAL IT MUST BE REPAIRED OR REPLACED
<br />WITHIN 24 HOURS OF DISCOVERY.
<br />3. TEMPORARY SEDIMENT BASINS SHALL BE MAINTAINED WHEN SEDIMENT REACHES 1/2 THE
<br />OU`i LET HEIGHT OR 1/2 THE BASIN STORAGE VOLUME. BASINS MUST BE DRAINED OR SEDIMENT
<br />REMOVED WITHIN 72 HOURS OF DISCOVERY.
<br />4. SEDIMENT MUST BE REMOVED FROM PAVED SURFACES WITHIN 24 HOURS OF DISCOVERY.
<br />5. EROSION INTO STREETS. WETLANDS OR WATER BODIES:
<br />A. IF ERODED SOILS (INCLUDING TRACKED SOILS FROM CONSTRUCTION ACTIVITIES) ENTER OR
<br />APPEAR LIKELY TO ENTER STREETS, WETLANDS, OR OTHER WATER BODIES, PREVENTION
<br />STRATEGIES, CLEANUP AND REPAIR MUST BE IMMEDIATE WITH THE APPROPRIATE APPROVALS
<br />FROM THE DNR, MPCA, OR ANY OTHER STATE, FEDERAL, OR LOCAL AGENCIES AS NECESSARY.
<br />THE OWNER SHALL PROVIDE ALL TRAFFIC CONTROL AND FLAGGING REQUIRED TO PROTECT
<br />THE TRAVELING PUBLIC DURING CLEANUP OPERATIONS.
<br />6. EROSION OFF-SITE:
<br />A. IF EROSION BREACHES THE PERIMETER OF THE SITE, THE OWNER SHALL IMMEDIATELY
<br />DEVELOP A CLEANUP AND RESTORATION PLAN, OBTAIN RIGHT -OF -ENTRY FROM THE ADJOINING
<br />PROPERTY OWNER AND GET APPROPRIATE APPROVALS FROM ALL STATE, FEDERAL, AND
<br />LOCAL AGENCIES AS NECESSARY. THEN IMPLEMENT THE CLEANUP AND RESTORATION PLAN
<br />WITHIN 48 HOURS OF OBTAINING THE ADJOINING PROPERTY OWNER'S PERMISSION AND
<br />APPROVAL FROM ANY APPROPRIATE STATE, FEDERAL, AND LOCAL AGENCIES.
<br />CONSTRUCTION SITE PRACTICES:
<br />1. WASTE AND MATERIAL DISPOSAL:
<br />A. ALL WASTE, UNUSED BUILDING MATERIAL (INCLUDING GARBAGE DEBRIS, CLEANING
<br />WASTES, WASTEWATER, TOXIC MATERIALS OR HAZARDOUS MATERIALS), COLLECTED
<br />SEDIMENT, ASPHALT AND CONCRETE MILLINGS, FLOATING DEBRIS, PAPER, PLASTIC,
<br />FABRIC, CONSTRUCTION AND DEMOLITION DEBRIS AND OTHER WASTES MUST BE PROPERLY
<br />CONTAINED ON SITE AND DISPOSED OF OFF SITE, NOT ALLOWED TO BE CARRIED BY
<br />RUNOFF INTO RECEIVING CHANNEL OR STORAGE SEWER SYSTEM.
<br />2. HAZARDOUS MATERIALS:
<br />A. OIL, GASOLINE, PAINT AND ANY HAZARDOUS SUBSTANCES MUST BE PROPERLY STORED,
<br />INCLUDING SECONDARY CONTAINMENT, TO PREVENT SPILL, LEAKS, OR OTHER DISCHARGE.
<br />B. RESTRICTED ACCESS TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM.
<br />C. CONCRETE WASH MUST BE LIMITED TO A DEFINED AREA OF THE SITE AND RUNOFF MUST
<br />MUST BE CONTAINED WITHIN THE DEFINED AREA.
<br />D. STORAGE OF HAZARDOUS WASTE MUST BE IN COMPLIANCE WITH MPCA
<br />REGULATIONS.
<br />3. LIQU'D WASTE:
<br />A. ALL NON STORMWATER DISCHARGES (CONCRETE TRUCK WASHOUT, VEHICLE
<br />WASHING, MAINTENANCE SPILLS, ETC. CONDUCTED DURING THE CONSTRUCTION
<br />ACTIVITY MUST COMPLY WITH THE NEWEST VERSION OF THE STATE NPDES PERMIT.
<br />4. SANITARY FACILITIES:
<br />A. ACEQUATE ON-SITE SANITARY FACILITIES SHALL BE PROVIDED IN CONVENIENT
<br />LOCATION(S) FOR ALL PERSONS WHO WORK ON THE SITE.
<br />5. TRACKING:
<br />A. EACH SITE SHALL HAVE GRAVELED ROADS, ACCESS DRIVES AND PARKING AREAS OF
<br />SUFFICIENT WIDTH AND LENGTH TO PREVENT SEDIMENT FROM BEING TRACKED ONTO
<br />PUBLIC OR PRIVATE ROADWAYS.
<br />B. ANY SEDIMENT REACHING A PUBLIC OR PRIVATE ROAD SHALL BE REMOVED BY STREET
<br />CLEANING BEFORE THE END OF EACH WORKDAY.
<br />6. DRAIN INLET PROTECTION:
<br />A. ALL STORM DRAIN INLETS SHALL BE PROTECTED DURING CONSTRUCTION WITH CONTROL
<br />MEASURES AS APPROVED BY THE CITY.
<br />B. THESE DEVICES SHALL REMAIN IN PLACE UNTIL FINAL STABILIZATION OF THE SITE.
<br />C. A REGULAR INSPECTION AND MAINTENANCE PLAN SHALL BE DEVELOPED AND IMPLEMENTED
<br />TO ASSURE THESE DEVICES ARE OPERATIONAL AT ALL TIMES.
<br />7. EXTERNAL WASHING OF TRUCKS AND OTHER CONSTRUCTION VEHICLES MUST BE LIMITED TO A
<br />DEFINED AREA OF THE SITE. RUNOFF MUST BE CONTAINED AND WASTE PROPERLY DISPOSED
<br />OF. NO ENGINE DEGREASING IS ALLOWED ON SITE.
<br />GRACING GENERAL NOTES:
<br />1. PRIOR TO INITIAL GRADING, THE CONTRACTOR IS RESPONSIBLE TO MAKE SURE ALL REQUIRED
<br />PERMITS AND APPROVALS HAVE BEEN OBTAINED.
<br />2. ABSOLUTELY NO CONSTRUCTION, GRADING, OR FABRICATION SHALL BEGIN UNTIL:
<br />A. THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS
<br />AND OTHER DOCUMENTS APPROVED BY ALL OF THE PERMITTING AUTHORITIES,
<br />B. ALL NECESSARY BMP'S ARE INSTALLED.
<br />3. GOPHER STATE ONE CALL (800) 252 - 1166, MUST BE NOTIFIED 48 HOURS PRIOR TO
<br />START OF CONSTRUCTION.
<br />4. ROCK CONSTRUCTION ENTRANCES (PER THE STANDARD DETAIL PLATE) MUST BE
<br />PROVIDED AT ALL CONSTRUCTION SITE ACCESS POINTS.
<br />5. TE,APORARY SEDIMENT POND(S) MUST BE ESTABLISHED IN INITIAL PHASE IN ORDER
<br />TO CAPTURE RUNOFF DURING GRADING OF THE CONSTRUCTION SITE.
<br />6. ALI. IMPROVEMENTS TO CONFORM TO CITY AND COUNTY'S LATEST STANDARDS
<br />SPECIFICATION.
<br />7. TOPSOIL MUST BE STRIPPED PRIOR TO ANY CONSTRUCTION, REUSE STOCKPILE ON SITE.
<br />8. IMMEDIATELY FOLLOWING GRADING OF (3:1 OR GREATER) SIDE SLOPES AND DRAINAGE
<br />SWALES, WOOD FIBER BLANKET OR OTHER APPROVED SOIL STABILIZING METHOD
<br />(APPROVED BY ENGINEER) MUST BE APPLIED OVER SEED MIXTURE WITH A MINIMUM OF
<br />4" *TOPSOIL.
<br />9. ALL FINISHED GRADES MUST SLOPE AWAY FROM PROPOSED BUILDINGS AT MINIMUM
<br />GRADE OF 2.0%.
<br />10. CONTRACTOR IS REQUIRED TO KEEP A COPY OF THE EROSION CONTROL PLAN ON SITE,
<br />AT ALL TIMES.
<br />VLM
<br />10
<br />ZzL0�
<br />wOwO
<br />U) Z LLJ
<br />C;Z
<br />��MI
<br />>5P
<br />ZwWI¢-
<br />N
<br />O CLU)
<br />Z
<br />LL
<br />Q ui
<br />QHziZ-
<br />Q
<br />J
<br />"Qx
<br />J
<br />�
<br />Lo
<br />N
<br />(D"
<br />Q
<br />OWZ
<br />0
<br />J
<br />CL Lu
<br />�ZZ=m
<br />>>
<br />06
<br />QZ
<br />J
<br />�
<br />m
<br />KWON
<br />F_ J D
<br />_ uj
<br />J 0:
<br />d.
<br />W
<br />LO
<br />W
<br />z
<br />J
<br />_
<br />..
<br />m
<br />z�Z
<br /><
<br />uj
<br />ZWZ0
<br />U <
<br />O>ieaz.
<br />ii
<br />V
<br />R'
<br />I.-
<br />z
<br />Iw-
<br />0
<br />W Q zz9
<br />r N
<br />r W
<br />I W p G W
<br />W (V z r- x
<br />a
<br />oN VVi �I o wo
<br />W
<br />O
<br />wOwO
<br />U) Z LLJ
<br />1J
<br />>5P
<br />ZwWI¢-
<br />w
<br />O CLU)
<br />m
<br />Q ui
<br />QHziZ-
<br />Z
<br />LL w O O
<br />uii
<br />LLLJ
<br />0
<br />w
<br />J
<br />CL Lu
<br />�ZZ=m
<br />=Ww
<br />F_oUz
<br />F_ J D
<br />_ uj
<br />J 0:
<br />uj
<br />O
<br />W
<br />F-Wg0
<br /><
<br />+v
<br />U <
<br />w~ZO
<br />W a g LU
<br />I.-
<br />z
<br />Iw-
<br />0
<br />W Q zz9
<br />=jg4Q�
<br />C)
<br />z
<br />Li
<br />0
<br />Q
<br />U
<br />p
<br />U
<br />j�.rao.0
<br />�f
<br />w
<br />Q
<br />0
<br />
|