Laserfiche WebLink
VD 0 k <br /> JOO <br /> i ,, , , <br /> 'i! CITY of ORONO <br /> ,, A f <br /> vs, y tf Municipal Offices <br /> ,,c4< ,•,,, i +_ G Street Address: Mailing Address: <br /> 9$Egg02750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 18, 2000 <br /> William& Nina McGuire <br /> 315 Woodhill Road <br /> Wayzata, MN 55391 <br /> Dear Mr. & Mrs. McGuire: <br /> An inspection of your septic system was conducted on October 17, 2000. A summary of the <br /> inspection is below. <br /> Septic Tank Condition <br /> 1. Pumpout needed within one year(last pumpout date 6/17/97) <br /> The septic system is a compliant system, meaning it meets all or most current City and State <br /> Standards. Enclosed is a list of licensed contractors who work in Orono on a regular basis. This <br /> list is enclosed simply for your reference in case your septic system needs maintenance in the future. <br /> Also enclosed is a fact sheet explaining your septic system and how it functions. Finally, an as-built <br /> drawing is enclosed showing the approximate location of the septic system. <br /> If you have any questions regarding this report, please contact me at the City Offices at 249-4600. <br /> Respectfully, <br /> iit30- PemiA7 <br /> s Pence <br /> rie <br /> On-Site Systems Manager <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property, <br /> be advised that this report does no guarantee or certify the existing system will continue to function properly,but <br /> is merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www.ci.orono.mn.us <br />