Laserfiche WebLink
/ ,�DiVit.-1 Aft./di,Ei✓ <br /> . <br /> / .•J BR E-20 <br /> MOUND DESIGN PROCEDURE (Continued) . <br /> (For Flows up to 1200 gpd) ._. . . - ... • <br /> G.3. Calculate basal width ratio H.2.f. Multiply dike multiplier by <br /> by dividing rock layer 2 downslope mound height to get <br /> loading rate of 1. 20 gpd/ft downslope dike width; <br /> by allowable soil loading y 76 x..3, 9 = /2, 6 f t <br /> rate; <br /> 1. 20 gpd/f t2 -0,`1$gpd/f t2 =2. 67 g. Compare the values of step H. 1 <br /> Check this value on page E-16. and step 11. 2•f. Select the <br /> greater of the two values as <br /> 4. Multiply basal width ratio by the downslope dike width; <br /> rock layer width to get ler- 6 feet <br /> required basal width; <br /> 2, 67 x /G ft Z6, 7ft h. Calculate upslope dike width 3: <br /> using upslope' mound height <br /> H. Downslope Dike Widthand upslope diko_,multiplier <br /> from page E-18• <br /> 1 . If landslope is 3% or more, Z. 6.' x 3.,� = ' 9, Y_f t <br /> i. Total mound width is the sum <br /> subtract rock layer width <br /> from basal width to obtain of upslope dike width plus rock <br /> minimum downslope dike toe width layer width" plus` �3ownslope dike <br /> 26. 7 ft - /p ft =./6"..-7ft width; <br /> Y ft +" /o ft -F/l 6ft =.3p Oft nii:1 <br /> 2. Calculate mound height at edge 3. If landslope is 2.9 percent or <br /> of rock layer on downslope side; less, basal width includes both ' • <br /> a . Determine depth of clean sand <br /> 4-114‘-6: 1"/6" ' fill at upslope edge of rock the upslope and downslope dike <br /> '4l.F, s6'- s layer: ,/ 5 feet widths. <br /> "771...147 <br /> b. Multiply rock layer width by a. Calculate downslope dike width <br /> landslope to determine drop using steps }1.2.a . through <br /> in elevation; 11.2.f; feet <br /> /0x y % - 100 = 0. 7f t b. Calculate upslope dike width <br /> c. Add drop in elevation to depth using upslope mound height and • <br /> dike multiplier from Page E-18; <br /> of clean sand at upslope edge <br /> of rock layer to get depth of x ft = ft <br /> clean sand at downslope edge , c. Add downslope—dike width. to <br /> • <br /> of rock layer. upslope dike width to rock <br /> 0, y f t + /. 5 f t = I. 9 f t layer width to get total mound <br /> d. Add depth of clean sand at down- width; <br /> slope edge to depth of rock ft + . ft + ft = ft <br /> layer to depth of soil backfill --- --- <br /> to get mound height at downslope d. Compare total mound width to <br /> required basal widthfrom step <br /> edge of rock layer; <br /> / G,..4 .9 f t +0.75 f t +425'f t =.3 9 f t If total mound width is <br /> f <br /> greater than' required basal <br /> e. Enter table on page E-18 with width, use calculated dike <br /> landslope and downsldpe dike ' widths. If required basal <br /> ratio. Select dike multiplier width is greater than total <br /> of y 7.6 • y:/ rea,,e mound width, increase downslope <br /> dike width. <br />