Laserfiche WebLink
BUILDING SUMMARY <br /> McGUIRE RESIDENCE, ORONO, MN <br /> SUMMARY OF HVAC LOADS FOR TOTAL BUILDING <br /> ROOM HEAT LOSS AND GAIN NOT INCLUDING VENTILATION <br /> FIXAMININIMAginna !���(• <br /> BTU/HR SENSIBLE LATENT 'TOTAL <br /> FIRST 119,662 64,529 11,478 78,690 <br /> SECOND 85,186 46,796 4,112 50,908 <br /> BASEMENT 11,400 - - - <br /> POOL 45,444 <br /> TOTALS 1 261,692 111,325 1 15,590 ] 129,598 <br /> NOTE: Heat loss and gain figures do not include Wine Cellar HVAC <br /> BATHROOM AND LAUNDRY AREAS VENTILATION REQUIREMENTS <br /> EWA: riVERESKAI� �x: � ' _ ;' r.:....r .. <br /> CFM SENSIBLE 'LATENT ]TOTAL <br /> FIRST 120 1,920 3,000 4,920 12,369 <br /> SECOND 1,520 24,320 38.000 62,320 156,674 <br /> TOTALS 1,640 26,240 I 41,000 I 67,240 169,043 <br /> SWIMMING POOL VENTILATION REQUIREMENTS <br /> OOLIN -HEATIN . t <br /> CFM SENSIBLE LATENT TOTAL <br /> 1500 24,000 37,500 61,500 154,613 <br /> FIRST FLOOR AIR HANDLING UNIT: <br /> TOTAL COOLING CAPACITY REQUIRED INCLUDING VENTILATION: 83,610 =7 TONS <br /> TOTAL HEATING REQUIRED INCLUDING VENTILATION: 132,031 BTU/HR <br /> SECOND FLOOR AIR HANDLING UNIT: <br /> TOTAL COOLING CAPACITY REQUIRED INCLUDING VENTILATION: 113,228 = 9.4 TONS <br /> TOTAL HEATING REQUIRED INCLUDING VENTILATION: 241,860 BTU/HR <br /> 11/16/97 <br />